ADVERTISEMENT

ADVERTISEMENT

Intervention Conclusions DWG Block for AutoCAD

Current state – Different places ( walls, baseboards , linings etc)

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

area, of environment intervention, Location:, cusco, district:, cusco, Province:, Department:, cusco, indicated, scale:, date:, October of, reed:, narrow, teacher: rene navarro a., narrow unicode ms, national university san antonio abad del cusco, faculty of architecture plastic arts, pathological study, Course: Unicode, intervention conclusions, room, Gallery, yard, satin code, west code, this code, south code, room, injury, cause, state, type of damage, diagnosis, materials, intervention causes, injury intervention, type of intervention, materials, fissure, mechanical, inactive, serious, injury, cause, state, type of damage, diagnosis, materials, intervention causes, injury intervention, type of intervention, materials, mechanical, inactive, serious, injury, cause, state, type of damage, diagnosis, materials, intervention causes, injury intervention, type of intervention, materials, inactive, injury, cause, state, type of damage, diagnosis, materials, intervention causes, injury intervention, type of intervention, materials, inactive, serious, injury, cause, state, type of damage, diagnosis, materials, intervention causes, injury intervention, type of intervention, materials, inactive, serious, crack, filtration, atmospheric agents, maintenance, moderate, serious, dirt, lack of maintenance., maintenance cleaning, maintenance cleaning, crack, per load, serious, the walls require the liberation of foreign elements alien to their evolutionary process, the walls, floors, injury: by physics, Cause: indirect maintenance mechanics, state:, intervention:, diagnosis:, injury: lost lead mechanics of the, Cause: mechanical physics, state: inactive, diagnosis:, type of intervention: repair, removal, removal of plaster, ceiling, injury: mechanical, Cause: physical, state: inactive, intervention: repair restoration, diagnosis:, window, injury: mechanical, Cause: physical, state: inactive, intervention: repair restoration, diagnosis:, door, injury: mechanical, Cause: physical, state: inactive, intervention: repair restoration, diagnosis:, serious, repair, removal, removal of plaster, of intervention, Location:, cusco, district:, cusco, Province:, Department:, cusco, indicated, scale:, date:, October of, reed:, narrow, teacher: rene navarro a., narrow unicode ms, national university san antonio abad del cusco, faculty of architecture plastic arts, intervention conclusions, Course: Unicode, intervention conclusions, room, Gallery, yard, injury, cause, diagnosis, fissure, the walls require the liberation of foreign elements alien to their evolutionary process, floor, by physics, Cause: indirect maintenance mechanics, state:, intervention:, Diagnostic: regular, injuries: lost mechanics of lead, mechanical physics, state: inactive, diagnosis:, type of intervention: repair, removal, removal of plaster, ceiling, injury: mechanical, Cause: physical, state: inactive, intervention: repair restoration, diagnosis:, window, injury: mechanical, Cause: physical, state: inactive, intervention: repair restoration, diagnosis:, door, injury: mechanical, Cause: physical, state: inactive, intervention: repair restoration, diagnosis:, serious, state, inactive, type of intervention, injury, cause, diagnosis, mechanics, serious, state, inactive, type of intervention, injury, cause, diagnosis, state, inactive, type of intervention, injury, cause, diagnosis, state, inactive, type of intervention, injury, cause, diagnosis, serious, state, inactive, type of intervention, injury, cause, diagnosis, state, type of intervention, injury, cause, diagnosis, state, type of intervention, by thrusts, crack, by thrusts, mechanics, physical, dirt, hint, lack of maintenance., mild, mechanics, crack, direct, per load, physical, filtration, hint, atmospheric agents, moderate, restoration, mechanics, consolidation, conservation, consolidation, conservation, gereneral works as the general works prior to the intervention will be carried out the general cleaning of the property that will include the removal of items other than the removal as well as demolitions that are carried out in the constructions that undermine the heritage in some buildings that undermine the heritage in some buildings that are in ruinous condition., work that includes the major removal elimination of all material, the end of the building, the cleaning of the land within the special care of the elements. loose of value the removal of other debris in order not to damage the original surfaces existing in strata not appreciable simple view, prevention works: a preliminary inspection will be carried out, that is, the precautions to prevent the collapse deterioration

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots
File Type dwg
Materials Plastic, Other
Measurement Units
Footprint Area
Building Features Deck / Patio
Tags , , , , , , , , ,

ADVERTISEMENT

Plans_Designs

Leave a Reply

ADVERTISEMENT