ADVERTISEMENT

ADVERTISEMENT

Underpinning Foundation DWG Block for AutoCAD

UNDERPINNING OF FOUNDATION RUN THROUGH MICRIPILING

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

section, low level, First floor, covers floor, third floor, second floor, main elevation, right side elevation, section, low level, First floor, covers floor, third floor, second floor, main elevation, right side elevation, initial, ground, of the shoe in inverted slope, armor, insertion of connectors. armor placement, concreted, adhesion plates, foundation work, remove flooring chop remove layers of mortar sand remove paneling., wood elements repair, reinforcement of wood beam with profiles in coinage of logs to support them on the metallic profiles. collation of a new plank., wrought, dintel ipn beams, cross beam heb, heb pillar, plates, original, First floor, foundation, works in wall. survey, initial deformation, wood beam: advanced state of putrefaction. does not fulfill structural function. insufficient reinforcement. needs replacement. joists base of logs of wood. they do not present state of advanced putrefaction. need reinforcement to support the weight. planking. has advanced putrefaction state. substitution. cover will be removed. floor coverings. will be removed to place reinforcing layer. later it will be replaced by a similar one., excessive repair arrow, hep, section, low level, First floor, covers floor, third floor, second floor, main elevation, right side elevation, reinforcement: slab, previous jobs, connectors reinforcement: concrete grit perlite fillers for grinding deformation restoration of floors, initial status scale, initial state, forged state wood beam: advanced state of putrefaction. does not fulfill structural function. need reinforcement base beams of wood logs. they do not present state of advanced putrefaction. with the introduction of a lower profile the compression layer will be so it is not necessary to reinforce them with sheet profiles. planking. has advanced putrefaction state. substitution. cover will be removed. floor coverings. will be removed to place reinforcing layer. later it will be replaced by a similar one., foundation with problems, low level, First floor, second floor, deck plant, third floor, section, main elevation, side elevation, previous work: shoring, low level, First floor, second floor, third floor, section, main elevation, side elevation, shoring: it is necessary to install props in all the façades of the façades as they are weaknesses in the rehabilitation. a whole band of struts in each floor next to the wall whose foundation must be reinforced. reinforcing forging. shoring both sides of the wall apear. forward the drawing of the shoring will be omitted, considering it sufficiently explained in the present planes to facilitate the compression of later planes., foundation work, initial state emptied ground oblique cut in zapata drilling in the ground of depth micropiltoe reinforcement: structural tube concrete of micropiles laying of reinforcements for beam beam concrete concreting of waist beam placement of adhesion plates, foundations new ground clearance oblique cut in zapata placement of beam reinforcement waist anchor plate waits concreting anchor plate placement metal bracket, Wall, waist beam, micropiles, primitive foundation, waist beam, anchor plate

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots
File Type dwg
Materials Concrete, Wood
Measurement Units
Footprint Area
Building Features Deck / Patio
Tags , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT