Transporter CART
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
date :, manufacture, therefore the contractor, must verify measurements on site., this plan is only for the purposes of, signature of approval, do not measure on plan, measurements in mm, project :, scale :, description :, plan not .:, drawing :, design :, revision, date, file :, designs, franarbo, manufacturing operations – colombia, wl llc, delivered by :, received by: