ADVERTISEMENT

ADVERTISEMENT

Hydrosanitary DWG Full Project for AutoCAD

Project – Several details – Control system Scada

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

location sketch:, developer:, name of the project:, floor plan, sanitary sewer, date :, plane no., check :, place :, in meters, content :, scale :, dimensions :, no. of revision., project, puerto vallarta, jalisco, terminal, maritima, puerto iguana, boul. fco medina a., fco. medina ascencio, darsena, mangle, national politecnico, faculty of law, univ. of sinaloa, orientation: connection project, sanitary discharge, ing. hector hernandez rivera, ing. cutberto barrier wheel, simbology :, av. walkway of the marine south hydrosanitary, three seas, owner :, project :, valve flexible seal gate, check, stairs with, flattened with, concrete curb, or cast iron, cut aa, bb cut, stone masonry, septum joined , variable, plant, note:, detail brocal, of fo.fo., final filling, pipe, pvc, level of dirt, initial filling, tube diameter, sand template, filling with material, or with mechanical equipment, with light equipment or manually, ridge, compacted fill, tilt or compacted, proctor in layers, ditch width, morsion theory, interior diameter, diameter:, ditch size, ditch width, vertical walls at least up to the back of the tube and with a width according to the, minimum widths of the ditches necessary for the installation of the pipes according to their, specifications, tube, board, commercial, diameter, in centimeters, the values ​​of all the columns are expressed, table of thickness of bed, proctor, the ca sand bed, bed, sand bed, template, bed thickness, pipe placement, kind of bed, filling between the pipe and the walls of the trench. the first is made with curved foot and, b.- when the tube is firmly bedded, use the flat foot on both sides., the filling should follow the installation as soon as possible :, the second with flat foot. the excavation free of stones., filling and stamping, the laying will be done placing the pipe in the bottom of the trench so that it supports in its lower quadrant and in the whole length with sand or a fine material product of free excavation of stones, model, full tension., list of equipment of the project, well of common visit, description of connection, tee, berths for special pieces, without scale, cross with reduction, elbow, tee and blind cover, hydrostatic of the pipes, dimensions for concrete berths, berths which will be perfectly supported to the bottom and wall of the trench, notes, inches, millimeters, nominal value of the piece, volume, cm., height, pipeline in roads, section a-a ‘, equipment of the project, street center, camellon, sidewalk, t uberia sanitary sewer, electric control panels, flygt pump, scada control system, potable water pipeline, hydraulic connection project drinking water network, hydraulic line

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Full Project
Category
Additional Screenshots
File Type dwg
Materials Concrete, Masonry, Other
Measurement Units Metric
Footprint Area
Building Features
Tags , , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT