Integrated installations plan and section set for a logistics center dry storage area. drawing includes HVAC (heating, AC, vent.), electrical cable trays, and fire protection sprinkler systems. Several transverse sections show mounting heights for smoke curtains (EI30), steel roof bracing, and structural columns with various dims (typ. 25x40cm). All technical specs for vacuum rainwater sewage and suspended drainage are mapped at 1:200 scale.