Industrial Logistics Center Dry Area Installations and Structural Sections

Integrated installations plan and section set for a logistics center dry storage area. drawing includes HVAC (heating, AC, vent.), electrical cable trays, and fire protection sprinkler systems. Several transverse sections show mounting heights for smoke curtains (EI30), steel roof bracing, and structural columns with various dims (typ. 25x40cm). All technical specs for vacuum rainwater sewage and suspended drainage are mapped at 1:200 scale.

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
English
Materials
Steel, Concrete, Plastic, Other
Units
Metric
Area
250 – 499 m² (2691.0 – 5371.2 ft²)
Features
A/C
Uploaded by
CAD Corner
Category
Commercial, Industrial
Published
Jun 8, 2026
Price $5.00
or

or get unlimited access from $7/mo

Browse All Downloads