First floor layout of a pharmaceutical manufacturing facility with integrated laboratory spaces. The drawing details multiple specialized, in essence, zones including quality control laboratories, analytical testing areas, and production spaces with clear circulation paths. Key features include:
Laboratory Modules:
– Chemical Analysis Laboratory (OF1.3.3.01)
– Instrumental Analysis Laboratory (OF1.3.2.02)
– Microbiology Laboratory (OF1.3.4.01) with separate elutriation room
– Reagent storage areas with specified climate controls
Technical Infrastructure:
– Cable routing channels (Kablo Geçiş Kanalı) for equipment connectivity
– Multiple technical service areas at +0.12 elevation
– NPU260 steel profiles for structural support
– Fixed HVAC grilles (600x600mm, 300x500mm, 300x300mm)
Circulation Elements:
– Six stairways (M1-M6) with various dimensions (typical: 15×25.1/25)
– Passenger elevators with 267x173cm shafts
– Industrial guillotine doors (300x300cm, 300x250cm)
The facility design incorporates modularity with standardized ceiling heights (H:130 and H:200) throughout different areas, enabling efficient workflow between production and testing zones while maintaining regulatory compliance for pharmaceutical manufacturing.