Oil treatment.
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Caseta bombs c.i., control room, Oil pumps house, Future separator, Install tab, Plan no., Rev., scale:, Department of engineering reliability, sheet, Finished according to painting specification., Notes, All dimensions are given in millimeters., Pipe assembly., See details of instrument installation., The dimensions will be verified adjusted in place before the prefabrication, Final welding., Material specification, Approved:, design:, Approved:, client, design, drawing:, date, description, Notes, engineering, do not., Approved, painting, firm, general conditions, Pressure, design, operation, P. H., corrosion, isolation, thickness, protection, diameter, description, Urethane aluminum, Cant, tolerance, Conventions, Existing pipe, raw, Field weld, New pipe, Epoxy primer, operation, temperature, Rating, fluid, material, Sch, Processes, civil, revised:, mechanics, Plan no., Rev., scale:, Department of engineering reliability, sheet, Finished according to painting specification., Notes, All dimensions are given in millimeters., Pipe assembly., See details of instrument installation., The dimensions will be verified adjusted in place before the prefabrication, Final welding., Material specification, Approved:, design:, Approved:, client, design, drawing:, date, description, Notes, engineering, do not., Approved, painting, firm, general conditions, Pressure, design, operation, P. H., corrosion, isolation, thickness, protection, diameter, description, Urethane aluminum, Cant, tolerance, Conventions, Existing pipe, raw, Field weld, New pipe, Epoxy primer, operation, temperature, Rating, fluid, material, Sch, Processes, civil, revised:, mechanics, Plan no., Rev., scale:, Department of engineering reliability, sheet, Finished according to painting specification., Notes, All dimensions are given in millimeters., Pipe assembly., See details of instrument installation., The dimensions will be verified adjusted in place before the prefabrication, Final welding., Material specification, Approved:, design:, Approved:, client, design, drawing:, date, description, Notes, engineering, do not., Approved, painting, firm, general conditions, Pressure, design, operation, P. H., corrosion, isolation, thickness, protection, diameter, description, Urethane aluminum, Cant, tolerance, Conventions, Existing pipe, raw, Field weld, New pipe, Epoxy primer, operation, temperature, Rating, fluid, material, Sch, Processes, civil, revised:, mechanics, Plan no., Rev., scale:, Department of engineering reliability, sheet, Finished according to painting specification., Notes, All dimensions are given in millimeters., Pipe assembly., See details of instrument installation., The dimensions will be verified adjusted in place before the prefabrication, Final welding., Material specification, Approved:, design:, Approved:, client, design, drawing:, date, description, Notes, engineering, do not., Approved, painting, firm, general conditions, Pressure, design, operation, P. H., corrosion, isolation, thickness, protection, diameter, description, Urethane aluminum, Cant, tolerance, Conventions, Existing pipe, raw, Field weld, New pipe, Epoxy primer, operation, temperature, Rating, fluid, material, Sch, Processes, civil, revised:, mechanics, Plan no., Rev., scale:, Department of engineering reliability, sheet, Finished according to painting specification., Notes, All dimensions are given in millimeters., Pipe assembly., See details of instrument installation., The dimensions will be verified adjusted in place before the prefabrication, Final welding., Material specification, Approved:, design:, Approved:, client, design, drawing:, date, description, Notes, engineering, do not., Approved, painting, firm, general conditions, Pressure, design, operation, P. H., corrosion, isolation, thickness, protection, diameter, description, Urethane aluminum, Cant, tolerance, Conventions, Existing pipe, raw, Field weld, New pipe, Epoxy primer, operation, temperature, Rating, fluid, material, Sch, Processes, civil, revised:, mechanics, Plan no., Rev., scale:, Department of engineering reliability, sheet, Finished according to painting specification., Notes, All dimensions are given in millimeters., Pipe assembly., See details of instrument installation., The dimensions will be verified adjusted in place before the prefabrication, Final welding., Material specification, Approved:, design:, Approved:, client, design, drawing:, date, description, Notes, engineering, do not., Approved, painting, firm, general conditions, Pressure, design, operation, P. H., corrosion, isolation, thickness, protection, diameter, description, Urethane aluminum, Cant, tolerance, Conventions, Pipe and