Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Church December 3 DWG Elevation for AutoCAD

ELEVATION CURRENT STATE OF THE CHURCH DECEMBER 3 FOR FURTHER INTERVENTION PROGRAM WITH PERU STATE BUILDING THE CHURCH IS LOCATED IN DECEMBER 3 BELONGING TO THE PROVINCE OF CHUPACA.LA CHURCH HAS THE FOLLOWING ENVIRONMENTS; BELL TOWER, MAIN ENTRANCE, SHIP; CONFESIONARIO; ALTAR; SACRISTIA;

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

elevation, court bb, ground floor, patio, nave, ceramic floor, altar, entrance, cut aa, polished cement floor, sidewalk, sacristy, baptistery, altar table, ambon, confessional, first floor, processional furniture, bell tower, tower, main circulation, current status, —–, see facade, metal, see cut, width, span key, height, alfeizer, material, windows, doors-screens, x height, key only spans, — —-, without windows and doors

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Elevation
Category
Additional Screenshots
File Type dwg
Materials Other
Measurement Units Metric
Footprint Area
Building Features Deck / Patio
Tags , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Projects

Leave a Reply

ADVERTISEMENT