This drawing is for the shuttering sections & excavation details of a dam intake shaft, inclusing the trashrack and lean concrete base. sections E-E and F-F are provided at 1/50 scale with specific material notes for C30 concrete and S420 steel could be useful in hydraulic dam construction projects.