Palm tree bracing details showing plan and cross-section views for specimen planting. The system utilizes 3 nos. 50mm x 100mm timber shores anchored by matching timber stakes. Spec includes a 200mm thk perforated polyethylene gravel drainage layer installed over compacted subgrade. The palm trunk is protected via burlap wrapping and hardwood battens to mitigate pressure from the supports. A soil separator is shown between the gravel and the specified planting medium. Provides typical installation requirements for heavy landscape specimens.