CCTV security layout for existing refinery and margarine plant facility on Hub-River Road. Plans cover the ground, first, and second floors with camera locations for the main refinery building, process areas, and site perimeter. Technical features include the old refinery, margarine process floor (~7650 sq ft), cold storage, and pouch filling area. External surveillance is mapped for the tanker bay, weigh bridge, and the 24′-0″ wide factory entrance. Specific MEP and utility zones like MCC rooms, boilers, cooling towers, and storage tanks (typ. ST/PST series) are indicated to assist with hardware positioning. Interior room dimensions are included for several blocks, such as the 30′ x 14′ rooms and the 4800 sq ft bottle filling zone. It’s a solid set for site security audiys or upgrading existing network video recorders.