ADVERTISEMENT

ADVERTISEMENT

Installation / Gas DWG Block for AutoCAD

Installation, gas.

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Lower ventilation, Lattice of, Installation wall water heater, N.p.t., Non-combustible wall, Proper bonding, Small collar, Diameter that, The conduit, Gas valve, Water valve, ceiling, N.p.t., ceiling, Instructions from the manufacturer must be installed., If wall is made of material it should be inserted, Between the heater a flat iron built with, Non-combustible material., The passage valve should be easily accessible to be the view., The individual evacuation conduit must be of a diameter, With minimum clearance that allows the introduction of the union, It should be sealed with similar high temperature silicone., Min., Gas outlet according to roof, Less conduit exit from the trestle, minimum, less, Exit of the conduit more than the trestle, minimum, more of, Niche type meter, detail, Metal shed with peephole, Location, ………………………………, Income date type, reference, Recreational condo, owner, Indoor installation of g.n., Viña del Mar, Installer, designer, Christhian magaña i., installed potency, Copper pipe type, Total facilities, total, Water heater, colors, Color plot, Red, thickness, rest, thickness, thickness, blue, thickness, thickness, black, Format, Article decree, Distances of other gas pipeline services., Gas lines should remain at least in any, Sense of crossing with pipes of other services., In all crossings protected with a concrete layer of concrete of cm, The separation of the gas line cm., In the crossings the gas pipes must be protected by a layer of mortar, Of a minimum thickness of cm on it that extends towards, Both sides of such pipes., By means of parallelism the fact that the gas pipes are inside the, Volume of excavation of other pipelines gas pipes throughout the extension, Shall not be installed within the volume defined by two vertical planes, Located a distance of cm each side of the pipes of other services., The view must also be located, The stopcocks must be quick cut, Such that its revision manipulation is, Accessibility, Welding must be used in gas networks, For all silver welding, Superintendency of electricity fuels., Duly authorized for this purpose in the, Should be performed only by gas installers of the class, Including the installation disconnection of, Renovation of interior gas installations, The development of, Chapter s, Article sec, Pipe use article, The embedded pipes in slab should have plastic coating, Its layout must be by exclusive zones., These zones are no more than cms. Of the parallel walls the respective, pipelines. If the plumbing is done in spaces these zones, May extend cms. Their joints must be protected with an insulation, Of expanded polystyrene another characteristic, note:, All the pipes that go up the artifacts, Must be the sight. decree, Test of the test should be performed with the type of gas air gas between nitrogen test that can be carried out by stretches of complete form the whole facility under inspection. Prior to the start of this it must be checked that the valves are closed that delimit the network the section of it under inspection that the intermediate valve keys are open. The minimum pressure of the tightness test is twice the service pressure of the low-span network with a graduated pressure gauge in a range of calibration in divisions of up to another instrument with similar characteristics with current calibration for the measuring range . Increase the service pressure by means of increments until the latter interrupts the supply by granting the necessary time for the stabilization until the inspection pressure is reached. Wait for at least fifteen to allow the stabilization of either temperature changes pressure air pockets in the pipeline. If an increase in pressure is observed in the means that the temperature of the circuit is increasing, an additional time must be waited until its stabilization. Once this has been confirmed, the initial pressure reading must be carried out to start the time count of the tightness test. The duration of the test depends on the volume of the network of the section of this time which must be calculated by applying the following formula test time the volume of the pipe in all of it must be at least fifteen and a maximum of one hour. Test all the valves disposed inside the section network under which they must be in position placing at the end a screw cap for threaded installations flanche blind for welded installations. Check that

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots
File Type dwg
Materials Concrete, Plastic, Other
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT