This technical drawing presents comprehensive construction specifications for the Phoenix Hotel landscape project. The document outlines detailed engineering requirements across six key sections including foundation bedding layers, ground engineering, waterproofing for pools, masonry structures, metal components, and wooden constructions.
Foundation Specifications: Requirements include 100mm C20 plain concrete and 150mm 3:7 lime-soil mixture for smaller structures. Ground surfaces specify C20 concrete structural layers with expansion joints every 6 meters, filled with asphalt hemp fiber and sealed with asphalt paste. Ground bearing capacity must exceed 100KN/m².
Material & Waterproofing Requirements: The document details proper installation of pebble surfaces, pool waterproofing systems using waterproof mats, and masonry specifications using MU7.5 shale brick with M5 cement mortar. Metal components require specific anti-rust treatments and wood elements must undergo anti-corrosion treatment with moisture content below 15%. This drawing serves as the authoritative reference for construction execution unless otherwise specified in other project documents.