ADVERTISEMENT

ADVERTISEMENT

Planimetry Electric DWG Full Project for AutoCAD

ELECTRIC PLANE CALCULATION TABLES FOR HOUSING PROJECT, TWO HOUSES WITH MODEL

Drawing labels, details, and other text information extracted from the CAD file (Translated from Galician):

pte:, connection scheme, unifilar diagram, load houses, primary rush, strangle, substation, short circuit, detail of substation red of polarization, structure code, neutral, frame of structures equipment, distance between post, c. c., pole type height, point, high school, primary, amount transf capacity, can not type of withhold, equipment, protection, observations, primary receipt point, item, full clamp, list of materials, description of the material, short circuit kv, cincho bandido de, staple agp, bandit buckle, common thread nut, arrester of kv, acsr aluminum cable, compression connector, High voltage fuse, solid copper conductor, polarizing transformer strain, anchor shackle, staple connects, thhn driver, clevis of primary auction, bar coperweld de with strain, Epoxy suspension type insulator, preformed for acsr cable, shoe clamp, conduit tube of, transf. of distribution kva, preformed for acsr cable, thhn cable, washer pressure hole of, machine pin, acsr aluminum cable, primary line owned by aes clesa modify, centrifuged concrete pole owned by aes clesa, cc post to install by aes clesa, Secondary line wp acsr install, simple anchor install, primary line monofasica kv install, centrifugal concrete pole to install the project, monophasic transformer kva install, transformer, houses, load box, pole, kva, location, total, housing, upload by, load, geodesic coordinates, coordinates, pole, driver type, neutral line, Summary kms chart of construction by level of voltage, voltage level, acsr, driver gauge, length, secondary line, primary line, acsr, c. c., ana lilian aguilar portillo, mauricio alfredo portillo, sandra machuca gomez, cecilio de jesus acosta, Queen of the Angels Garcia, Mrs. Portillo, Oscar Nehemias Salazar Vouchers, owner, table of inhabitants, item, roberto carlos polanco trigueros, oscar ernestovaldez aguilar, jose domingo cabrera, juana isabelcampos, maria edith reyes zepeda, julia martinez, ricardo ernesto hernandez escobar, juana ortiz cardona, alex adalberto zepeda siguenza, Miguel Angel Avalos, maria luisa valdez orantes, transformer capacity calculation: watts f.d. f.c f.s., demand factor, f.s. factor of, charge for housing:, coincidental factor, centrifugal concrete pole to install the project, c. c., c. c., double anchor install, existing pole, Primary delivery point install, pte:, connection scheme, unifilar diagram, load houses, primary rush, strangle, substation, short circuit, detail of substation red of polarization, pte:, detail of substation red of polarization, houses type, centrifuged concrete pole owned by aes clesa, class cc post waiting for primary struc, simple anchor install, centrifugal concrete pole to install the project, monophasic transformer kva install, centrifugal concrete pole to install the project, double anchor install, street pte., avenue the angel, church, mayorship, park, old street in exile, Location of, project, cemetery, to exile, beyond, urban area, the paradise, street ote, location schema, no bait

Raw text data extracted from CAD file:

Language N/A
Drawing Type Full Project
Category
Additional Screenshots
File Type dwg
Materials Aluminum, Concrete
Measurement Units
Footprint Area
Building Features Garden / Park
Tags , , , , , , , , , , , ,

ADVERTISEMENT

Plans_Designs

Leave a Reply

ADVERTISEMENT