Wastewater Treatment Plant – Sludge Processing Facility Plan & Sections

Multi-level architectural and process plan for a sludge processing facility at Kolhapur Municipal Corporation. This drawing includes three floor plans (EL.550.000, EL.555.000, EL.560.000) and multiple sectional views (A-A, B-B, C-C, D-D) detailing the sludge processing infrastructure.

Key Components:
– Centrifuge house with 3-ton monorail system (TOS EL.551.400)
– Sludge pump house (FFL.549.800)
– Sludge sump (TOC.548.600) with mixer and PVC encapsulated access rungs
– Centrate sump (TOC.548.600)
– DWPE dosing area with tanks and pumps
– 230mm thick brick parapet walls (1000-1200mm height)

Technical Specifications:

– Finished ground level (FGL): EL.549.500m
– Finished floor level (FFL): EL.549.800m
– Centrifuge weight: 1900kg with operational speed of 2950 RPM
– Foundation details for pumps and equipment with hold points for vendor GADs
– Drainage systems with 300mm×300mm drains and puddle pipe connections
– Includes comprehensive puddle pipe schedule with sizing (25-50mm NB) and material (SS 304)

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
English
Materials
Concrete, Masonry, Steel
Units
Metric
Area
250 – 499 m² (2691.0 – 5371.2 ft²)
Uploaded by
Engineer K
Category
Water Sewage & Electricity Infrastructure
Published
Oct 28, 2025
Price $7.50
or

or get unlimited access from $7/mo

Browse All Downloads