Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Single Family Housing Project DWG Full Project for AutoCAD

Architecture – Foundations – Esctructuras – Electrical I. – I. Health

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

bedroom, living room, kitchen, first floor, second floor, bathroom, patio, passageway, first floor foundations, ground load capacity, lengths of overlaps, unit: handmade kk brick, -coating, -albañileria, -acero construction, – reinforced concrete, – simple concrete, technical specifications, foundation, ladder, foundation detail, stone pilca, foundation, overburden, ground, concrete, false floor, natural, head wall, rope wall, lightened first floor, water to housing, cistern detail, supply, discharge, overflow and cleaning are indicated in, note: the details of installation and distribution of the lines, instruction manual provided by the manufacturer, drain network, distribution line, lid sanitary, stop and start pumping, automatic electric control, support for automatic control, hat vent, line of impulsion, standing, ends e electrowelded mesh, ventilation and overflow hook, universal connection, check valve, level control, octagonal box, gate valve, sealed plug, – the connections can be threaded or fit between pvc pipes and fittings, – the pipes to be used will be pvc-sap, – hydrostatic tests will be carried out in the water network, – the gate valves will go between two universal joints, a.- start the pump when the water level in the elevated tank, descend up to half of its height, b.- Stop the pump when the water level in the cistern discharges, or flange, the immediately adjacent joints in the impulsion piping, discharge on supports independent of the pump smelters, and , installed with the smallest possible number of elbows, b.- in the impulsion pipe immediately after the pump, a retention valve and gate valve should be installed in the pipe, suction with positive pressure is installed a gate valve, a retension valve at its lower end to prevent discharging, d.- the capacity of the pumping equipment must be equivalent to the maximum demand, aluminized iron hinge, gate valve, niche with frame and lid varnished wood, aluminized iron hinge with chromed bronze handle and sig-sag fixation system, metal lid, chromed bronze handle, niche projection, universal union, niche perspective and wooden frame, front view, installation detail Valve gate, legend drain, description, irrigation tap, cold water pipe, symbology, cross, tee, meter, register box, registration threaded floor, drain, simple yee, diameter reduction tub., hot water pipe, blind box with registration, water legend, vh, vs, vd, note: continuous slab lightened to future, note: continuous foundations to future, empty, going, variable ø, temperature, detail of lightened, hollow brick, detail ledevigas, -supercharging, lightened second floor, first floor electrical installations, second floor electrical installations, legend, exit for ceiling lighting, exit for lighting on the wall, exit for spot light, distribution board, kw meter, exit for square pass box on the wall, exit for bell, exit for TV antenna, exit for telephone, well to ground, simple unipolar, double and triple switch, detail of well to earth, sifted and compacted earth, ground conductor, welded joint clamp, brazed disperser, whose dimensions and characteristics shall comply with the provisions of the national electricity code, b.- the contractor shall supply and install all the pass boxes required for the installation, copper bar for the connection of earth, the boxes for lighting exits, electrical outlets, switches, tv, kitchen and step will be iron, conductors will be unipolar electrolytic copper wire with insulation, use standardized curves and connectors tube to box, industrial salt, first level lighting, network, outlet first level, diagrams of principle, well, to earth, kitchen, electric pump, outlet bathrooms first level, reserve, well to ground, comes enosa, tg., se, sf, intercom, bell, sr, ss, feeders, ups cond., second level lighting, second level outlet, second bathroom outlet level, sanitary facilities first floor, sanitary facilities second floor, comes drinking water, from smap, continuous distribution of, cold water, goes to the collector, public, arrives sewer network

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Full Project
Category
Additional Screenshots
File Type dwg
Materials Concrete, Plastic, Wood, Other
Measurement Units Metric
Footprint Area
Building Features Deck / Patio
Tags , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT