Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Electric Installation Gym DWG Full Project for AutoCAD

Electric project Osorno Gym – Chile – Details

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

tda tc ilum, to t.d.a., ticket office, basketball m, to t.d.a., ramp, public access, bleachers, to t.d.a., tda tc ilum, tennis m., banking reserves, jury, bleachers, exhaust outlet, women’s bathroom, bathroom men, to t.d.a., stage, banking reserves, bleachers, jury, bleachers, ramp, tda tc ilum, banking reserves, tennis m., public access, bleachers, basketball m, ticket office, bathroom men, exhaust outlet, bleachers, banking reserves, stage, women’s bathroom, ramp, to t.d.a., exhaust outlet, bleachers, bath, winery girl, discolored, winery girl, bleachers, to t.d.a., meetings, bathroom men, women’s bathroom, winery girl, dressing room, humid network, school access, winery girl, teacher, dressing room, cellar, exhaust outlet, discolored, winery girl, bath, bleachers, dressing room, winery girl, women’s bathroom, bathroom men, school access, bleachers, winery girl, meetings, cellar, dressing room, teacher, winery girl, ramp, humid network, plant, symbology, to t.d.a., to t.d.a., blueprint of electrical installation of lighting school gym j. r. sanchez, sheet of, esc:, August, dib .: Jorge Oyarzo f., owner, designer, inscription in s.e.c., Location, plant lighting plugs, power cable secure hook support bracket electrical equipment upper body lamp holder lamp w. reflector body, industrial luminaire w. high pressure sodium, female plug ticino mod. amp, male plug ticino amp. mod., cordon st awg, fastening chain, luminaire w., t.p.r.v., luminaire installation detail, sect. earth mesh: cu des. Total length mts h. mts, connection point metal structure construction., detail connection metal structure mesh ground, metal pillar construction, connection by autofusion, conductor cu des. h., sodium industrial lamp high pressure w., universal square ceiling, apply a satin glass globe, metal halide focus w., fluorescent w. with f.p., fluorescent w. hermetic with f.p., Fluted inlay focus. conpacto inlay w., palfon turtle w., emergency lamp hours autonomy. ampoules, Location, inscription in s.e.c., designer, owner, Osorno, dib .: Jorge Oyarzo f., August, esc:, sheet of, unilinear diagonals charge boxes, connected mesh, al tda, t.t.s., t.t.p., tp., ts., b. cu m.l, amp., int. aut brand saime, saesa, Inspection camera, c: pvc, s: thhn, thhn, t.t.p., t.t.s., unilinear diagram t.d.a., from t.d.a., xtu pvc conduit mm subt. meters, t.d.a., cctos., lamp holder, fluorescent, plugs, start, others, total centers, p. k.w., phases, dif., disy, cond., duct mm, protections, canalization, lighting load chart t.d.a., cctos., t.d.a., total centers, lighting load chart t.d.a., lamp holder, others, start, plugs, fluorescent, p. k.w., canalization, protections, disy, dif., phases, total, amp., aliment, t.p.r.e., thhn, t.p.r.e., ma., Location, tda, tda, court lighting, lighting gallery, Main access ticket office, bathrooms dressing rooms, cellar hall, bathrooms dressing rooms, Main access ticket office, sector court hall, control desk, duct mm, aliment, cond., t.p.r.e., amp., ma., thhn, t.p.r.e., amp., ma., thhn, amp., t.p.r.e., thhn, amp., t.p.r.e., thhn, amp., t.p.

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Full Project
Category
Additional Screenshots
File Type dwg
Materials Glass, Other
Measurement Units
Footprint Area
Building Features
Tags , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT