Treatment Plant Of Drinkable Water DWG Block for AutoCAD
Treatment plant for 50 lps flow
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Upper lower plate, For both walls, Cut box, Parshall channel reinforcement cut, Parshall channel, Quiet box, Alabama flocculating wall reinforcement plant, The form is done in concrete, Alabama flocculating walls, Alabama flocculating plant, Construction gasket, Detail bushes, Rough, surface, Similary, Sika tape pvc, unscaled, In walls, Both, Face in contact, Sikalastic stamp hb, with water, Similary, Steel, reinforcement, unscaled, Construction gasket, Similary, Sika tape pvc, Steel, reinforcement, Sikalastic hb seal similar, On floor slab, unscaled, Exterior, Min., surface, Rough, at every turn, Structural plant settlers of high rat filters, Structural longitudinal cutters high rat settlers filters, The minimum coating for the reinforcing steel will be cm, detail, Construction materials., Fully waterproofed concrete, The concrete should have a minor relationship, Reinforcing steel for, With plastocrete d.m. Of sika similar., Equal size of the aggregate of, A poor concrete layer of cm should be placed, Are respectively., Before merging any structure on the ground, All dimensions are in except where otherwise specified, The minimum overlaps for the reinforcing rods, Of foundation., unity., Additional reinforcement of slab walls should be placed in all, The corners of this detail additional reinforcement corners, Joints of the same should be fastened with, Contact surfaces should be free of sand other, Thick wire during the casting of concrete without drilling., During the placement of the sikalastic hb seal on the surface of, Contact must be clean free of grease residues, All pipeline ducts must be provided, As shown in the general plans of the facilities., Each face of the walls in contact with the water should have said seal., Should be cured at least ten days before being submitted to water., For the correct installation of the pvc tape type similar in the, E.a.c.p., from:, drawing:, No plan, scale:, Specifications:, M.p. do not., Ing.robinson ramirez parra, supervisor:, Vo.bo. Secretary of works, September of, date:, General scheme of treatment of drinking water, Contains:, M.p. do not., Location:, Ing. Mauricio lozano guarnizo, consultant:, Vo.bo. consultant, M.p. do not. Cnd., Alley of san lorenzo municipality of castilla the new goal, design:, Processing facilities, San lorenzo aqueduct, Mauricio lozano, Specialist structures, Street no villavicencio, Municipality of castilla la nueva, San Lorenzo, Of the populated center of, Sewage, Improvement of the, For the correct installation of the pvc tape type similar in the, Should be cured at least ten days before being submitted to water., Each face of the walls in contact with the water should have said seal., As shown in the general plans of the facilities., All pipeline ducts must be provided, Contact must be clean free of grease residues, During the placement of the sikalastic hb seal on the surface of, Thick wire during the casting of concrete without drilling., Contact surfaces should be free of sand other, Joints of the same should be fastened with, The corners of this detail additional reinforcement corners, Additional reinforcement of slab walls should be placed in all, Construction materials., detail, The minimum overlaps for the reinforcing rods, Are respectively., Reinforcing steel for, The concrete should have a minor relationship, unity., Of foundation., All dimensions are in except where otherwise specified, Before merging any structure on the ground, A poor concrete layer of cm should be placed, Equal size of the aggregate of, With plastocrete d.m. Of sika similar., Fully waterproofed concrete, The minimum coating for the reinforcing steel will be cm, For the correct installation of the pvc tape type similar in the, Should be cured at least ten days before being submitted to water., Each face of the walls in contact with the water should have said seal., As shown in the general plans of the facilities., All pipeline ducts must be provided, Contact must be clean free of grease residues, During the placement of the sikalastic hb seal on the surface of, Thick wire during the casting of concrete without drilling., Contact surfaces should be free of sand other, Joints of the same should be fastened with, The corners of this detail additional reinforcement corners, Additional reinforcement of slab walls should be placed in all, Construction materials., such
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Steel, Other |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, block, drinkable, DWG, flow, kläranlage, plant, treatment, treatment plant, water |