This project consists of a small 3D bus terminal, with up to four units and an area of ??vehicle loading and unloading of parcels, this terminal has benches and wheelchair bays, all within a structure indoor metal.
This project consists of a small 3D bus terminal, with up to four units and an area of ??vehicle loading and unloading of parcels, this terminal has benches and wheelchair bays, all within a structure indoor metal.