Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Cellular Base Station DWG Plan for AutoCAD

Plans Cell Base Station Architecture – Green Field

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

N.m., N.p.t., date:, scale:, Sheet number:, flat:, professional:, specialty:, Location:, reviewed by:, date, stage:, draft:, Approvals, Responsible for work:, design, This document is, Is strictly prohibited, Telephone ownership, Mobile your reproduction, The information contained, Indicated, concertina, N.p.t., N.t.n., Self-supporting tower, cut, Die-cast finished semi-polished gray, yard, N.p.t., global, Painted semi-polished finish with gray enamel, Semi-polished finish wall painted with gray enamel, Antennas, lighting rod, Beacon light, Support mw height azimuth set by t.m., Antennas, lighting rod, Beacon light, Support mw height azimuth set by t.m., Finished brick wall, Outdoor platform, Rbs, Plywood metal door, Finished brick wall, concertina, Self-supporting tower, N.t.n., cut, Die-cast finished semi-polished gray, yard, Antennas, lighting rod, Beacon light, Support mw height azimuth set by t.m., Finished brick wall, concertina, Self-supporting tower, N.t.n., Solid outdoor platform finished polished cement floor, New meter install, Concertina projection, Brick wall finish single-glazed beams columns finished cement semi-polished painted with gray enamel build, Pdp, entry, Polished cement floor, If the site requires satelite this would have to be the orientation of the north in the west directions should not have obstacles in the visit, yard, Gravel finish, Earth pit install, Pending concrete channel, Rainwater collector, Water drainage pipe, Rainwater collector, pending, Projection tower zapata, Ladder support install, Proy. Ladder rack, To install, Solid outdoor platform finished polished cement floor, New meter install, Concertina projection, Brick wall finish single-glazed beams columns finished cement semi-polished painted with gray enamel build, Pdp, entry, Polished cement floor, If the site requires satelite this would have to be the orientation of the north in the west directions should not have obstacles in the visit, yard, Gravel finish, Earth pit install, Pending concrete channel, Rainwater collector, Water drainage pipe, Rainwater collector, pending, Projection tower zapata, Ladder support install, Proy. Ladder rack, To install, Self-aligning triangular tower, Earth pit install, pending, Self-aligning triangular tower, Solid outdoor platform finished polished cement floor, New meter install, Concertina projection, Brick wall finish single-glazed beams columns finished cement semi-polished painted with gray enamel build, Pdp, Master, Master, entry, Polished cement floor, If the site requires satelite this would have to be the orientation of the north in the west directions should not have obstacles in the visit, yard, Gravel finish, Earth pit install, Pending concrete channel, Rainwater collector, Water drainage pipe, Rainwater collector, pending, Projection tower zapata, Ladder support install, Proy. Ladder rack, To install, Earth pit install, pending, Self-aligning triangular tower, Detailed floor plan, Equipment coverage, Ladder rack, N.p.t., New meter install, Pdp, Pdp, If the site requires satelite this would have to be the orientation of the north in the west directions should not have obstacles in the visit, Proy. Ladder rack, Earth pit install, Self-aligning triangular tower, Ladder support install, entry, Polished cement floor, To install, Solid outdoor platform finished polished cement floor, yard, Gravel finish, Projection tower zapata, New meter install, pending, Pending concrete channel, Rainwater collector, If the site requires satelite this would have to be the orientation of the north in the west directions should not have obstacles in the visit, Earth pit install, yard, Gravel finish, Earth pit install, To install, your B. Water drainage, Pending concrete channel, Rainwater collector, your B. Water drainage, Brick wall finish single-glazed beams columns finished cement semi-polished painted with gray enamel build, Concertina projection, Pdp, entry, Polished cement floor, New meter install, Pending concrete channel, your B. Water drainage, Proy. Ladder rack, Ladder support install, To install, Brick wall finish single-glazed beams columns finished cement semi-polished painted with gray enamel build, Earth pit install, your B. Water drainage, Self-aligning triangular tower, Projection tower zapata, Self-righting tower

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Plan
Category
Additional Screenshots
File Type dwg
Materials Concrete, Wood
Measurement Units
Footprint Area
Building Features Deck / Patio, Car Parking Lot
Tags , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply

ADVERTISEMENT