Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Cover Tower Saint Marks DWG Detail for AutoCAD

Construction details of the Tower Saint Marks of Frank Lloyd Wright

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

sections. raised, heavy work, gomez, of peanuts, lloyd wright, araujo, appearance, thorn of the monteros, roast, of materials, with the specifications of the current hg, control coefficients according to ehe, technical documentation of the project, all elevation levels are expressed in m., the folding of legs will be done in hot., the foundations will support compacted ground previously., any armature splice is made according to the ehe instruction., it will be the contractor’s responsibility to check the strength of the ground prior to construction., cleaning, mass, to arm, in round, tights, ordinary, in rolled sections in, bolts of segun in, in hollow profiles according to, of the work, of security, actions, permanent, variables, to drain the surfaces of the screen wall. below the water table, a float chamber is used to avoid condensation with drains each with a slope of approx., sanitation is divided into rainwater downpipes., downpour, fecal drain pvc pipe, manifold, recordable chest, small support shoe, brick wall half a foot, siphon casing, drain, concrete tube, cheeky camera, top, of covers, of a bath its chests, of the building with drawers scheme, connection to sewage system, kind, collection of downpipes has a record on each drain, of with registration, collection system, with sewage system, bidet, siphon, chest, model in, flange anchored to the wall, sinks, general section of terrace floating sinks, meeting t. floating with steps, constructive section, details, saint marks, lloyd wright, of materials, with the specifications of the current hg, control coefficients according to ehe, technical documentation of the project, all elevation levels are expressed in m., the folding of legs will be done in hot., the foundations will support compacted ground previously., any armature splice is made according to the ehe instruction., it will be the contractor’s responsibility to check the strength of the ground prior to construction., cleaning, mass, to arm, in round, tights, ordinary, in rolled sections in, bolts of segun in, in hollow profiles according to, of the work, of security, actions, permanent, variables, the roof deck is a walkable deck that is in the last with a finish that is attached to the sloped deck that the water drops them by some elements holding what are called plots., wrought, pre-cast steel pipes, down, bowl, rack, lightened concrete from, reinforcing sheet, natural stone tile flooring, tiling on dividers, plot adjustable, thermal insulation, general, roof: a walkable roof, cover scheme, roofs: slopes for drains, in section of the cover, the meeting of the walkable terrace with the steps, of his

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel
Measurement Units
Footprint Area
Building Features Deck / Patio
Tags , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT