ELECTRICAL INSTALLATIONS APPROVED
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
The Andes, linea ff. DC., route, street the tordilla, San Felipe, air club, The Andes, el sauzal street, Location, reg. s.e.c., installer, rut:, rep. leg. Mr. patricia triviño, rut:, san esteban ltda., real estate developer, acceptance interested, installer, sheet:, scale:, date: october, commune of the andes, alley the tordilla, san rafael sector, valley of the real, installation project, electric lighting, social housing committee, housing type, date, registration number, record s.e.c, existing meter, rate, rpt ohm, neutral, t.p., rpt prot. ohm, existing meter, rate, rpt ohm, neutral, t.p., rpt prot. ohm, ground floor, existing, ground floor, extension, existing, access, existing meter, rate, rpt ohm, neutral, t.p., rpt prot. ohm, note: materials that require certification, for your fulfillment with this requirement, rpt serv. ohm, unilinear diagram, curve, t.d.a., neutral, t.p., projected, rpt prot. ohm, general plant, October date, acceptance interested, installer, reg., Andes, carlos araya guarda, passage cerro jines oriente, lighting summary table, previous power kw. increase of power kw. total power kw., load box lighting, pot., phase, ench, total, lamp, cto, center, esp., canalization, protections, cond.mm, duct, dif., disy, lighting the whole house, Location, total, lighting the whole house, location map, esc., plantation, channel, the roses, the labyrinth, street four, street six, lions high street, the labyrinth, existing, s.e.c., registration number, date, existing, existing, passage cerro jines oriente, street hill high lions, street two, street hill high lions, passage cerro jines oriente, street four, the high labyrinth, emilio perez lara, installation project, electric lighting, house room, phone, location sketch, curve, neutral, t.p., rpt prot. ohm, t.d.a., existing, splice, rut:, rep. leg. Mr. patricia triviño, rut:, san esteban ltda., real estate developer, acceptance interested, architect, sheet:, scale:, date: december, commune of the andes, high lions, Maria Paula, expansion project, housing committee, sector the labyrinth, cad car drawing: ninoska araya