Plano Flocculators DWG Block for AutoCAD
Plano floculador treatment plant water
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Good type cable, Plain pendants, your B., scale, your B., Air pass, Air pass plant, Pass air profile, Anchoring chamber, Reinforced concrete tower, mobile, Heater, Concrete f’c, mobile, Heater, Concrete f’c, Anchoring chamber, Reinforced concrete tower, Esc, cut, Comes from the, pumping, station, Elbow mm, diffuser, centered, typical, E.g., Cement homigon, centered, gate, gate, orifice, centered, Pre-fabricated covers:, gate, gate, gate, gate, filter, Channels, isolation, Sediment water channel, Chlorination chamber, Interconnection channel, gate, gate, gate, butterfly valve, butterfly valve, butterfly valve, butterfly valve, Railing, Esc, Plant filters, Concrete cover, ceiling:, Hollow in the, Concrete cover, ceiling:, Hollow in the, Concrete cover, ceiling:, Hollow in the, Concrete cover, ceiling:, Hollow in the, zone, Zone ii, Zone iii, Zone iv, Design of horizontal flocculators, Elbow mm, flange, Break water, cut, Esc, Drain gravel, False bottom, sand, anthracite, Free edge, metal lid, metal lid, Pipe of, camera of, Chlorination, channel of, interconnection, channel of, isolation, Sludge evacuator, Butterfly valve, channel of, interconnection, channel of, distribution, Filters, Location of the gate, cut, Esc, Drain gravel, False bottom, sand, anthracite, Free edge, metal lid, metal lid, Pipe of, camera of, Chlorination, channel of, interconnection, channel of, isolation, Sludge evacuator, Butterfly valve, channel of, interconnection, channel of, distribution, Filters, Location of the gate, cut, Esc, Drain gravel, False bottom, sand, anthracite, Free edge, metal lid, metal lid, camera of, Chlorination, channel of, interconnection, channel of, isolation, channel of, interconnection, channel of, distribution, Filters, Location of the gate, valve, butterfly, Fox, tube of, Break water, flange, typical, draft:, flat:, Apartment, Distr, Prov, Revised approved by:, sheet, Design drawing:, scale:, Indicated, Project level of technical file, Ing., Carabaya, fist, Macusani, Total sheets, Location, date:, October, Of drinking water services in the province of, Ing., Air pass m., Snip code, draft:, flat:, Apartment, Distr, Prov, Design drawing:, scale:, Indicated, Project level of technical file, Carabaya, fist, Macusani, Location, date:, February, Of drinking water services in the province of, Flocculator, Design drawing:, Provilcial municipality, From macusani, sheet, Total sheets, Snip code, Elbow mm, Comes from the pumping station, Water intake, Flocculation zone, Ramp mixer ramp mixer, zone, Zone ii, Zone iii, Zone iv, Elbow mm, Elbow mm, Comes from capture, Water intake, Ramp, Water height, Height of asbestos cement board, Detail of horizontal flocculator, Metalic, Base, see detail, Note: spacing, Between partitions varies, According to design, Profiles, Wall, Asbestos cement sheet, Bolts, profile of, stainless, Recessed, In wall, steel sheets, stainless steel, Removable screens, Asbestos cement, cap screw, profile, Loose profile, Attached the iron, Fiberglass, Recessed, profile, To the wall, Metalic, see detail, Profiles, With studs, Iron sabesto cement, detail, Esc, cut, flange, Break water, flange, Break water, Esc, cut, Given from, concrete, gate, valve, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Coagulant dosing, Zone iv, zone, Zone ii, Zone iii, Zone iv, Ramp, Has decanter, flange, Break water, Esc, Flat flocculators, Esc, Ramp mixer, Comes from capture, Has decanter, Esc, cut, Esc, Cut structures, Esc, Cut structures, gate, valve, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Zone iv, Esc, Flat flocculator structure, typical, Rings, centered, Rings, centered, centered, centered, centered, centered, centered, centered, centered, centered, centered, centered, diffuser, Good of the room, Coagulant chemistry, diffuser, Half pipe, Holes, section, Detail: diffuser, Esc, Half pipe, Holes, centered, centered, centered, centered, centered, centered, centered, centered, centered, centered, Esc, Cut structures, draft:, flat:, Apartment, Distr, Prov, Design drawing:, scale:, Indicated, draft
Raw text data extracted from CAD file:
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Good type cable, Plain pendants, your B., scale, your B., Air pass, Air pass plant, Pass air profile, Anchoring chamber, Reinforced concrete tower, mobile, Heater, Concrete f’c, mobile, Heater, Concrete f’c, Anchoring chamber, Reinforced concrete tower, Esc, cut, Comes from the, pumping, station, Elbow mm, diffuser, centered, typical, E.g., Cement homigon, centered, gate, gate, orifice, centered, Pre-fabricated covers:, gate, gate, gate, gate, filter, Channels, isolation, Sediment water channel, Chlorination chamber, Interconnection channel, gate, gate, gate, butterfly valve, butterfly valve, butterfly valve, butterfly valve, Railing, Esc, Plant filters, Concrete cover, ceiling:, Hollow in the, Concrete cover, ceiling:, Hollow in the, Concrete cover, ceiling:, Hollow in the, Concrete cover, ceiling:, Hollow in the, zone, Zone ii, Zone iii, Zone iv, Design of horizontal flocculators, Elbow mm, flange, Break water, cut, Esc, Drain tapes, False bottom, sand, anthracite, Free edge, metal lid, metal lid, Pipe of, camera of, Chlorination, channel of, interconnection, channel of, isolation, Mud Evacuator, Butterfly valve, channel of, interconnection, channel of, distribution, Filters, Location of the gate, cut, Esc, Drain tapes, False bottom, sand, anthracite, Free edge, metal lid, metal lid, Pipe of, camera of, Chlorination, channel of, interconnection, channel of, isolation, Mud Evacuator, Butterfly valve, channel of, interconnection, channel of, distribution, Filters, Location of the gate, cut, Esc, Drain tapes, False bottom, sand, anthracite, Free edge, metal lid, metal lid, camera of, Chlorination, channel of, interconnection, channel of, isolation, channel of, interconnection, channel of, distribution, Filters, Location of the gate, valve, butterfly, Fox, tube of, Break water, flange, typical, draft:, flat:, Apartment, Distr, Prov, Revised approved by:, sheet, Design drawing:, scale:, Indicated, Project level of technical file, Ing., Carabaya, fist, Macusani, Total sheets, Location, date:, October, Of drinking water services in the province of, Ing., Air pass m., Snip code, draft:, flat:, Apartment, Distr, Prov, Design drawing:, scale:, Indicated, Project level of technical file, Carabaya, fist, Macusani, Location, date:, February, Of drinking water services in the province of, Flocculator, Design drawing:, Provilcial municipality, From macusani, sheet, Total sheets, Snip code, Elbow mm, Comes from the pumping station, Water intake, Flocculation zone, Of ramp mixer ramp mixer, zone, Zone ii, Zone iii, Zone iv, Elbow mm, Elbow mm, Comes from capture, Water intake, Ramp, Water height, Asbestos cement sheet height, Detail of horizontal flocculator, Metalic, Base, see detail, Note: spacing, Between partitions varies, According to design, Profiles, Wall, Asbestos cement sheet, Bolts, profile of, stainless, Recessed, In wall, steel sheets, stainless steel, Removable screens, Of asbestos cement, cap screw, profile, Loose profile, Adhered the iron, Fiberglass, Recessed, profile, To the wall, Metalic, see detail, Profiles, With studs, Iron sabesto cement, detail, Esc, cut, flange, Break water, flange, Break water, Esc, cut, Given from, concrete, gate, valve, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Dosage of coagulant, Zone iv, zone, Zone ii, Zone iii, Zone iv, Ramp, Has a decanter, flange, Break water, Esc, Flat flocculators, Esc, Ramp mixer, Comes from capture, Has a decanter, Esc, cut, Esc, Cutting structures, Esc, Cutting structures, gate, valve, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Plate screen, Asbestos cement, Zone iv, Esc, Flat flocculator structure, typical, Rings, centered, Rings, centered, centered, centered, centered, centered, centered, centered, centered, centered, centered, centered, diffuser, Good of the room, Coagulant chemistry, diffuser, Half pipe, Holes, section, Detail: diffuser, Esc, Half pipe, Holes, centered, centered, centered, centered, centered, centered, centered, centered, centered, centered, Esc, Cutting structures, draft:, flat:, Apartment, Distr, Prov, Design drawing:, scale:, Indicated, draft
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Block |
Category | Water Sewage & Electricity Infrastructure |
Additional Screenshots | |
File Type | dwg |
Materials | Concrete, Glass, Steel, Other |
Measurement Units | |
Footprint Area | |
Building Features | Car Parking Lot |
Tags | autocad, block, DWG, kläranlage, plano, plant, treatment, treatment plant, water |