ADVERTISEMENT

ADVERTISEMENT

Plano Pedestrian Bridge Over Canal Lined DWG Detail for AutoCAD

Details – specifications – sizing – Construction cuts

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

name, pbase, pvgrid, pegct, pfgct, pegc, pegl, pegr, pfgc, pgrid, pgridt, right, peglt, pegrt, pdgl, pdgr, section, left, channel soltin, channel carpenter, channel cava a, channel trapiche, channel aurich, prolongation grau, passage alcantara, prolongation freedom, tupac amaru, prolongation santa clara, arequipa, sucre, nicanor carmona, bolivar, avenue victor muro, san martin, three marias, santa rosa, avenue tacna, canal carpenter, avenue peru, canal cava b, global, guillermo la flor, puente bolivar, tres marias bridge, tupac amaru bridge, concrete flooring, bridge arequipa, santa rosa bridge, guillermo la flor bridge, alcantara bridge, tube railing, sucre bridge, carpintero culvert, neoprene, fixed support, with elastomeric seal, shaft, track, var., axis, track, flow, existing bridge, to demolish, track limit, water level, concrete, joint detail, dilation, coating, elastomeric , tecknopor, insulating material, joint detail, concrete, plant, detail- fixed support, neoprene, tecnoport, joint sealant, according to, specifications, chamfer, long, reinforced concrete, detail-movable support, drainage, surface runoff, interception brute, bruña, anchoring detail, railing, for liquid concrete, see detail, asphalted, technical specifications, structures, concrete cyclopean, reinforced concrete, steel, coating, over load, carrying capacity, barranda fºgº, architecture, freight train, note, r:, board, filling with loan material , profile of land, selected and qualified, huaca, housing, new town, stadium, the mall, urban area, ferrenafe, property of the institute, lopez albujar, ditch morals, ditch the town, ditch the tutumo, acetin soltin, trapiche ditch, soltin channel, h. aurich, el carmen, av. victor muro, stuffing compacted with, canal axis, the town, thickness., formwork., the curing will be carried out with additive, which will be applied with a spraying equipment. the application will be carried out, immediately after the surface water has disappeared, taking care to achieve a continuous and consistent protection film., detail of joints., resistance of the ground, joints, minimum coatings, before starting the works of earthworks for the construction of the bridge, the topographic survey of the area of ​​influence of the abutment must be carried out. The excavation works up to the bottom elevations will be carried out manually, the compaction will be carried out when the material present the adequate humidity until reaching a density, earthwork, neoprene seals, surface runoff, second phase c, line, welding, track axis, railing, before starting the earthmoving works for the tracing of the The channel must be surveyed, surveying the area of ​​the canal axis whose plan must be approved by the supervisor. Pactación will be carried out when the material presents the adequate humidity until reaching a density, diameter through which liquid concrete will be placed, to avoid that these are subtracted., neoprene, emptying joint, detail b, detail d, vehicular bridge – steel reinforcement, excavation line, vehicular pass, b – b cut, detail c, left side board, service road, existing bed splice, expansion joint, elastomeric joint, detail – plaster with concrete, detail a, gravity wall , cutting aa, bb cutting, channeling wall, pedestrian bridge – three maria, natural terrain profile, cleaning and clearing of terrain, loan material, cyclopean concrete, technopor, drainage, pvc pipe, foam rubber, sidewalk, ladder and path, detail, ladder, concrete, modification, description, item, date, approval, revised, load design, cement, type i, handrail fºgº, neoprene mobile support :, water cement ratio, joints:, cured c chemical additive, ø in., length of anchors, anchor, splice, hooks, support splices and hooks, vehicular pass – reinforcing steel, a-a cut, elastomeric, longitudinal joint, type I section, road fastener, service, channel coating, existing terrain line, fºgº railing, concrete slab, cut aa – bridge – reinforcing steel, channel type IV, neoprene mobile support :, cured with chemical additive, – priming base, – epoxy anticorrosive in the welding points, – finished with synthetic enamel

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel, Other
Measurement Units Metric
Footprint Area
Building Features
Tags , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT