Piping regulation in receiving area and measuring
Drawing labels, details, and other text information extracted from the CAD file (Translated from Galician):
In s.a. From c.v., Mexican investigation corporation, No turrets, Plant of general location, Fire pit pumps, Agreement:, O.t .:, place:, Tamaulipas, Flat no., Rev., Dib., C.g.z., Project, Ing R.m., Rev., Ing R.m., Coord., Project, Ing J.u.p.i., Esc., Act In: mm, Date:, Development of pre-search detail engineering, For the technological update of the control systems, Of the licensed gas distribution terminal in tepeji hgo., Drawing drawn on:, D.f., Basic petrochemical, Pemex gas, Services, Depto boss Ingria Of project, Ing Salvador i want garcia, Approved by, Internal review, R.m., For customer comments, R.m., Client approval, R.m., Definitive lifting of the station no turrets., File:, Date:, C. P., Date, Mca, Date, By, Vo.bo., Num, Of sand, Of assembly see cont. Top left, Of sand, Of sand, Concrete platform, Exc, Exc C.p.abajo, Exc C.p.abajo, Exc C.p.abajo, Cople s.w., Network Exc, C.p.abajo, Exc C.p.abajo, Cople, Cople s.w., Cople s.w., Pink cup, Conc, Cople, Rosc, Concrete platform, Pipeline arrangement, Esc., N.p.t., N.t.n., N.s.p., Conc, Previous notes, For notes symbology abbreviations, For details summary of media, See no plane Sheet, See no plane, Full rtj, Runny male, Pink cup, Of sand, Of assembly see cont. Lower right part, Niv. Variable, Pipeline arrangement, Esc., Niv. Variable, Conc