ADVERTISEMENT

ADVERTISEMENT

Restroom Toilets Installation DWG Detail for AutoCAD

DESIGN AND DETAILS OF SANITARY FACILITIES

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Bylayer, Byblock, global, Inst. Sanitary: ss. H H., Go ss.hh. Of the address, Pvc, ventilation, box of, C register box, C register box, Comes from ss.hh. of direction, Pvc salt goes tank, Low t., Pvc tube, High tank, Secondary classrooms, Tank tank, Pvc, Yee, Comes water from, elevated tank, Pvc, Go septic tank, To travel see, Key plan, Isometric high, Esc., Hp electric pump, consultant:, Elaborated:, drawing:, approved:, reviewed:, archive:, flat, date:, scale:, Indicated, J.c.s., S.c.q., October, District municipality of checras, district, province, Department:, location, region, Huaura, lime, Punch, Checras, general, module:, flat:, description:, sanitation, Septic tank: for students, Inst. Sanitary: direction, Pvc, Low fºg, Go ss.hh., Go up fºgº, Fg, Comes from tank of, N.t.n .:, Public water supply pvc arrives, symbol, cold water, Low elbow, Elbow goes up, Cold water pipe, description, drain, symbol, Universal union, Sluice gate, check valve, measurer, elbow, Elbow with vent., elbow, Yee simple, Simple tee, Threaded bronze plating, Ventilation pipe, Drainage pipe p.v.c., description, Go ss.hh. Of the pvc address, Go ss.hh. Multiple pvc, Rotoplast cistern, Fg, Pvc water arrives, Cº registration box:, Ball Valve, Electric pump, The water pipes shall be of sealed class with, The drainage pipes will be of pvc salt will be sealed with, The operation of each sanitary appliance shall be verified., Remaining in duct without allowing escapes., The drainage pipes will be filled after the, The tests are carried out with the help of a hand pump up to, The gate valves will be brass type crane pressure, The ventilation pipes will be of pvc salt will be sealed, With special glue., Achieve a pressure of minutes., The internal network of water will be for cold water, Technical specifications, Special glue., For its correct functioning., Electrical control board required, By the driver with all his, Pending at least towards sinks., Execute the work taking into account the indicated, The finishing of the ceilings floors will take a, The contractor of the sanitary facilities should, In memory specifications, Techniques of the manufacturer’s design, Of the documents to ensure the, Perfect functioning of the systems., Where such indications only appear in some, Perfect functioning of the systems., Of the documents to ensure the, Techniques of the manufacturer’s design, General notes:, In memory specifications, The contractor of the sanitary facilities should, The finishing of the ceilings floors will take a, Execute the work taking into account the indicated, Pending at least towards sinks., By the driver with all his, Electrical control board required, For its correct functioning., The pumping equipment must be supplied, Drain outlets, wall, N.p.t., of water, Lav., W.c., Esc., Point outputs, Mts., Pumping characteristics, Units, flow, power, Dynamic height, Suction pipe, motor, Units, flow, power, Dynamic height, Suction pipe, motor, Power pipe, Minutes, Pumping time, Valve stand, Fg, Water rises from t.e., Pvc tube, Rrd, pipeline, Paths, Secretary, address, Project: construction of the educational institution, No san agustin de puñun, seminar, Thistle, Pablo j., Ventilation up, Ss.hh., children, Ss.hh., Girls, Deposit, Ss.hh., Teachers, Ss.hh., teachers, sidewalk, Ss.hh., children, Ss.hh., Girls, Deposit, Ss.hh., Teachers, Ss.hh., teachers, sidewalk, ventilation

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT