Detailed cross-sectional view (C-C) of a water control gate system for irrigation infrastructure in Batang Hari, Indonesia. The drawing shows reinforced concrete construction with specific structural detials for water flow regulation. The project is located in Pulau Raman village, Pemayung district, covering approximately 68.39 hectares. The plan includes technical specifications for primary and secondary channels, benchmarks with UTM coordinates, and elevation data (ranging from +25.00 to +31.00). Notable features include:
Hydraulic Elements:
– Water flow control gate mechanisms
– Canal system with primary and secondary channels
– Sluice gates for irrigation regulation
– Concrete reinforcement details
Site Context
The drawing identifies connections to existing water infrastructure including S.Darat and S.Bulian rivers, with specific control points marked throughout the site. Elevation benchmarks are meticulously documented to ensure proper water gradient across the irrigation network.