Laying Of Power Cable 69 Kv DWG Block for AutoCAD Procedure: Once the trench has been excavated, and if applicable to the respective land classified bed, cable is lowered into the trench, laying it done with a Side Boom 583… Read More $3.87 Close CAD Drawings or $3.87 – Add to Cart Checkout Added to cart