Laying Of Power Cable 69 Kv DWG Block for AutoCAD

Procedure: Once the trench has been excavated, and if applicable to the respective land classified bed, cable is lowered into the trench, laying it done with a Side Boom 583 or a backhoe PC220LC – 8, which lifts the coil and moving it mobilizes and unwinding with sufficient experienced staff for this purpose who will control the advance of laying, the cable should fall by gravity effect, while a skilled (2) cable combed properly controlling non-overlapping; perform what hairstyle qualified for this purpose (electrical minimum B) who enzuncharan every 5 mts.

Raw text data extracted from CAD file:

PREMIUM

File Details

File Type
DWG
Type
Block
Language
N/A
Uploaded by
CAD Drawings
Category
Water Sewage & Electricity Infrastructure
Published
Jul 14, 2017
Price $3.87
or

or get unlimited access from $7/mo

Browse All Downloads