Third Floor Ceiling Coordination Plan with mep Integration

Comprehensive coordinated ceiling layout for third floor of a commercial office building with integrated MEP systems. The drawing depicts a large commercial space (approx. 312m × 162m) divided into multiple functional zones including conference rooms, server rooms, and open office areas.

Key Systems Integrated:
– Fire protection system with sprinkler network (25Ø-150Ø header pipes)
– HVAC distribution with supply/return air ducts, diffusers and acoustic insulation
– Data raceway with various sizes of perforated cable trays (100-450mm × 70mm)
– Fire detection system including multisensor detectors, manual call points, and response indicators
– Electrical conduits with various diameters (25Ø-80Ø)

Space Programming

Includes specialized areas such as:
– Server room with 24 racks
– Conference rooms (small, medium, large)
– Huddle rooms and phone booths
– Open pantry areas
– Document storage and printing facilities
– IT depot (372 SFT)

Structural considerations show column placement and slab extents across multiple floors with cutouts for atriums and light wells. Scale is 1:100 with measurements in millimeters, adhering to commercial building standards.

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
English
Materials
Aluminum, Glass, Steel
Units
Metric
Area
Over 5000 m² (53819.5 ft²)
Features
A/C, Elevator, Escalator
Uploaded by
Engineer K
Category
Mechanical, Electrical & Plumbing (MEP)
Published
Oct 28, 2025
Price $15.00
or

or get unlimited access from $7/mo

Browse All Downloads