ADVERTISEMENT

ADVERTISEMENT

Elevator Otis DWG Detail for AutoCAD

Elevator Otis – Details – Plants

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

vertical section, note, chopping of doors., of the, build wall, slab drilling plant, light door, cad generated drawing, minimum isolation of airborne noise in the, vertical horizontal construction elements that, make up the fourth according to the, basic building norm, door, plataf, low lintel, c. maq minimum, hollow hd, hollow hw, doors, viewed, entrepisaderas, hollow hw, viewed, doors, of minimum machines, minimum, of minimum machines, granite, green oil, blue Night, rubber, rubber black circles, granite, coffee, lignite, cabin interior, light doors, seen front, cw cabin, cw delivery, hollow width hw, cd booth, depth of hollow hd, entrerail, minimum, minimum machine room, right, left, all doors must have the same sense of openness., mark a cross in the box corresponding to the chosen disposition., layout of the doors, thickness, slab mm, Drill dimensions, light mm., hollow width hw, cw delivery, cw cabin, seen front, light doors, depth of hollow hd, cd booth, flush, entrepisaderas, detail of light doors mm., plant machinery room, hollow plant, pavement, hollow conformal, to the regulation, last access, light door, low height lintel, hollow roof height, travel, zunchos, Employment limits:, work supplies customer charge, hole, fourth, machines, diverse, gap dimensions, maximum hole dimensions, maximum access, maximum travel, emplacement of machinery over the gap, a smooth hole with smaller collapses according to the regulation of, Lifting appliances with permanent top, surface of the gap transverse., a watertight pit capable of supporting the loads indicated in this plan., the necessary belts in the hollow for the anchoring of the fixings of the guides, of counterweight cab., the received auction of the doors of his by otis. detail, a quarter of machines with easy illuminated lux ventilated, to evacuate due to the equipment in addition to the heat without exceeding, of interior temperature. equipped with a metal door with lock., the concreting of the for the conform the measures of this, plane capable of withstanding the loads if the machine, is over the rest of the surface of the room, must provide a removable metal of how, access ladder., a metal hatch on the floor of the machine room hooks on the roof, located above the mechanism flap for a charge of kp, the first kp the second., the force rush lighting in the room with its, fuses its connection under tube to the control panel., both under the regulation of low for a, fall from below to below those indicated below., a ground connection taken to the lift pit according to the regulations, low, one is provided to the neutral of the, starting from the beginning of the assembly the necessary current for the tools, of work the tests of putting point of the elevator., the provisional protections in the accesses to the durant

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials
Measurement Units
Footprint Area
Building Features Elevator
Tags , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT