Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

3 Bedroom House Expansion Project Levels DWG Full Project for AutoCAD

Expansion project room house

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

laundry, date, number of pieces, finish, brand, scale, weight, material, checked, antonio.c, reference, drawn, mexico, scales, plate, contrabbe cb, ptr, low column of hot water, meter, key nose, symbology, hot water, up column of cold water, low column of cold water, up column of hot water, bcac, scac, scaf, bcaf, cold water, register with strainer, record, downstream sewage, ban, damper three ways , bright plafond, tv cable, contact, telephone outlet, wiring by wall, meter, load center, connection, symbolism, spot output, flying buttress, up, access, axes, dimensions, local, texts, isolated footing of adjoining, insulated inner footing, trabe of reinforced concrete, column of reinforced concrete, column of ptr, castle of mooring, support of beams mount, foundations, structure, symbols, furniture, details, proy. tinaco, template, detail of record, concrete, dimensions in cms., exit, red mud partition, seated with mortar, floor registration, floor, constructive, pvc, tube, variable, entry, board, npt, anchor, flattened, auction, sandpit, fine, flooring, projection, trench, angle, with steel angle, counterframe with, reinforced concrete and, pvc, half-length, concrete wall, armed with, in both directions , angle frame, blind cover, wire, both directions, blind cover, counter frame, reinforced concrete castle, with concrete, reinforced concrete counter, reinforced concrete lock., the center., filled with white river sand , level of firm., level of natural terrain., armor, negative, valid semi-resistant, concrete vault, forged cross section, curb, asphalt layer, concrete pipe, property limit, meter box, green area, variable according to meter, to sanaa for your installation in your, opportunity, leave co wick with, sufficient length for, that when the plumber, install the meter, cut it, at convenience and install the respective female adapter, item, accessories, quantity, note:, size of the pump, in no way reduce, the suction tube must be exactly the one, pichancha, absorption pipe, material for the installation of a pump, gate and check swing valve, all the threaded nipples are galvanized, pump connection detail, flow direction, wardrobe, master bedroom, dining room, stay, bar, entrance, toilet, kitchen, bathroom, dressing room, main entrance, garden, terrace, pend. ceiling, breakfast, kitchen, pantry, low, reading room, laundry, washing machine, roof, water tank, gas lp, cl., breakfast bar, staircase, garage, roof terrace, bedroom, symbology, indicated, exit for telephone, exit for television , load center, general switch, cfe meter, cfe connection, low pipeline, cold water network copper pipe, hot water network pipeline, ups pipe, af, ac, ran, blackwater drop, vent pipe, tv, bthc, bt, btaf, rainwater drop, bap, st, sthc, staf, sthf, ran, black water, collector mpal., rainwater, street, sanitary installation, hydraulic installation, ground floor, plant second level, third level floor, plant ceilings, electrical installation, ground floor architectural expansion, second floor level architectural expansion, third floor level architectural expansion, plant roofs extension, first level floor, rap, front facade, architectural floor current state, concrete column, detail s., second level floor dalas expansion, concrete castle, change of slab with slope, concrete template, panel w, record, float, slab for, heavy traffic, drowned, pipe , feeding, street, supply, pipe, or pichancha, foot valve, ball valve, filter, pump, electronivel, filling, castles, wall, gray partition, cistern, installation, gray partition, gandole water it is necessary., quality of the materials:, inside or outside the wall will have the amount of water, corrugated and folded, allowing a uniform layer of mortar and the alignment of zontals and verticals of the piece. its thickness will be the minimum, the constituent materials. the maximum size of the aggregate, which assures a liquid consistency without segregation, – roof, – armex, – castles, of the project axis., hours from the initial mixing., until it returns to the desired consistency agre-, the mixing time, once the water is added, not absorbent, if possible with a mechanical mixing., placement. the materials will be mixed in a container, which reaches the maximum fluidity compatible with an easy, specified resistance, – annealed red partition, specifications :, after uncoiling., curing membrane., will give you the following treatment:, the evaporation of the water of the surface., to be done when the concrete has reached one, location

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Full Project
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel, Other
Measurement Units Imperial
Footprint Area
Building Features Garden / Park, Garage
Tags , , , , , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT