Overall site plan for a major industrial complex, mainly focused on the electrical and telecom services connection points. We’ve laid out the Brunei Methanol Company site along with the Hydrogen and Formaldehyde plots, incl. the Spark Centre and utility reserves. It shows the 6m wide asphalt and gravel roads, parking for 15 cars, and a 20-container space yard. Detailed specs for the 9.5m x 4.5m substation and MCC package units are here too. I’ve included existing features like the river, pipe stanchions, and the Tutong Highway connection.Scale is 1:2000, all in metric.