Diagram Of Cooling Warehouses DWG Detail for AutoCAD

Details – specifications – sizing

Drawing labels, details, and other text information extracted from the CAD file (Translated from Romanian):

station, station, station, limit, stbet, fence, stbet, road, road, fence, stbet, road, road, fence, limit, road, road, stbet, limit, road, road, fence, road, road, road, road, construction, construction, construction, construction, fence, construction, fence, stbet, fence, stbet, construction, construction, stbet, construction, stbet, road, road, road, road, stbet, sttellemn, stbet, road, road, fence, sttellemn, fence, fence, fence, sttellemn, road, road, homeowner, fence, construction, construction, construction, fence, stbet, construction, construction, construction, construction, fence, construction, construction, stbet, construction, share, construction, construction, construction, construction, fence, fence, fence, share, construction, stbet, fence, fence, road, road, stbet, road, road, stbet, pre-insulated pipe pre-insulated pipe olzn return pipe pre-insulated platform water chiller, concrete platform, pit, ramp, agricultural land, electric air cable, refrigeration depot, scale, to the spear, to botosani, existing electric power stations, rv mm, ssa mm, metal platform, Pvc Pvc Pvc Return Pvc Pipe for ultra low oxygen with capacity of kg to with Flexible Air Pump Capacity with Pcc Air Pump Capacity with Tank Capacity, will be complied with the provisions of the normative collections law with permanent additions to which are as technical equipment of legal entities certified with authorized personnel. the materials used will correspond technical delivery of the technical documents. the materials used will be approved by the quality bulletins issued by the welding materials used for the corrosion protection materials will be made by priming with lead-based primer layers for the pipes that paint with oil layers for the apparent circuits. the pipelines will be mounted on metal supports according to the det. type tests trial and hidden works will be attached to the building’s book. valves will be checked at for the period, they will drop the indicator plates and take precautions for this purpose., deposit, deposit, metal platform, rv mm, ssa mm, the scrawny note will be read together with the plaque and the written pieces, deposit, deposit, rv mm, ssa mm, rv mm, ssa mm, rv mm, ssa mm, rv mm, ssa mm, ramp

Raw text data extracted from CAD file:

PREMIUM

File Details

File Type
DWG
Type
Detail
Language
N/A
Materials
Concrete
Features
Car Parking Lot
Uploaded by
CAD Drawings
Category
Climate Conditioning
Published
Sep 7, 2017
Price $3.00
or

or get unlimited access from $7/mo

Browse All Downloads