Earthfill dam cross-section with silty clay core and sand-gravel shell

Typical cross-section for an earthfill dam with a silty clay core and sand/gravel shell. I’ve included the upstream and downstream slopes with crest elev. at 498.00 and max water level at 495.00. Drawing covers specific embankment zones, volume calcs for shell fill, finger filters, and riprap protection. Shows foundation excavation (approx.), cutoff excavation, and the 20cm cleaning/grubbing/stripping layer. Includes toe drain, spillway discharge channel chimney filter, and slope protection details. Good starting point for hydraulic or civil infra projects involving large scale earthworks. All volumes are listed in m3

FREE

File Details

File Type
DWG
Type
Section
Language
English
Materials
Concrete, Masonry, Other
Units
Metric
Area
Over 5000 m² (53819.5 ft²)
Features
Garden / Park
Uploaded by
Eng_Plans
Downloads
3 downloads
Category
Public Facilities, Roads, Bridges and Dams
Published
Jul 20, 2026

Download faster, ad-free, with more daily files from $7/mo

Browse All Downloads