Main floor and basement; as well as a reference section of the draft cusco audience; basic requirements and building system .
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
n.m., sports court, floor: polished cement, ss.hh. disabled, rei sac, grid, vehicular income, elevator, hall, stage, backstage, parking, ss.hh. males, auditorium, floor: decking, ss.hh. women, multipurpose room, control, cash register, accounting, mezzanine, distribution hall, false tile ceiling, calamine coverage, plate, street slope, tank, booth, electric pump, machine house