Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Elevator DWG Detail for AutoCAD

elevator – Lift Pit – Plants – Cortes – Details – Technical specifications

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Vertical section, note, Of doors., of the, Wall build, Slab boring plant, Door light, Cad generated drawing, Minimum isolation of airborne dba in, Horizontal vertical construction elements which, Make up the room according to the, Basic rule of the building, door, Plataf., Under lintel, C. Maq. minimum, Of hollow hd, Hollow hw, doors, viewed, Interlocking, Hollow hw, viewed, doors, Of machines minimum, minimum, Of machines minimum, granite, Green oil, blue Night, rubber, Black circles rubber, granite, coffee, lignite, Interior cabin, Hollow plant, Fundamental plan of stake out, Plant room of machines, stainless steel, Otiskin white light, Height c. Minimum machines, Plataf., Height under lintel, Door light, door, Of hollow hd, The hw beam, Hollow hw, viewed, doors, Interlocking, Of machines minimum, Of machines minimum, Interior cabin, Firm ground, For doors of o.p. Mm. Subtract mm. The quota, Recommended cab cw cd mm., Recommended dimensions depending on the gap, B. Diverter, O.p., Thickness slab mm., Minimum machine room, Entrerrail, Hd hollow depth, Cd cabinet, Hollow width hw, The hw beam, Deliver cw, Cw cabin, Front seen, Light doors, Drill dimensions, calculate, stirrup, Pulleys, pulley, Minimum machine room, ventilation grill, Of hollow., Plug, lighting, Switch of, In different machine room the depth dimension will be, With hatch control lsvf the depth will be mm., Hd mm., Booth decorate on site, architect, client, address, Automatic telescopic doors, Contract data, Automatic telescopic booths in cabin, Room machines above the gap, A side counterweight, On the back work supplies on behalf of the, client, The signer of the plane accepts the layout dimensions of this plane, date, firm, Optional items, Important: the dimensions of the plane that have, Box are mandatory., Middle to bottom, Constant Handrail: Mandatory Side, at the bottom, In front of the mirror, To the bottom in front of the mandador, Full side, Simplex, Collective selective, duplex, Access, stainless steel, Lateral in central panel, Curved ceiling, without, White carrara, Silvery, stainless steel, Otiskin white, Mandador, Curved ceiling, Lateral in central panel, Full side, Cabin finishes, Version cl, Version cs, wood, natural, turquoise, Gray titanium, White, Otiskin, cream, gray, Blue zirconium, peach, Floor doors, Primed sheet, Access, Automatic simple, Maneuvers, Collective downhill, Simplex, Options, Lift otis, Date edition, Reason for Reissue:, unity, Drawn: j.m.z., Checked: j.c.g., various, finish, door, cabin, Shiny chrome, golden, Building designed, sheet, They are, Door light, ventilation, permanent, Monorail for handling machinery, concrete slab, To the regulation, Hollow according, pavement, Light mm., pavement, Hollow according, To the regulation, Number of rings, Maximum distance between straps, Reinforced watertight trench, Height between accesses, designation, access, pit, last access, Height of hollow, Straps, minimum, note, Of doors., after the, Wall build, Flush, Interlocking, scheme, Connection panel, Otis, maneuver, picture, C.maquinas, hole, cabin, lighting, force, Lighting and, Plug switch, Power entrance, Note, Car, Hoistway, Machine room, Light, Power, To otis, Controller, Diagram, New regulation, maximum, travel, maximum, Positional on main floor, Main lift, Auxiliary lift, Full rem, Photocell, Parachute in counterweight, Vel., Mark one where appropriate., Electrical characteristics of the engine, system, Vel., Maximum number of accesses:, start, tension, nominal, Interior cabin height, Above the tractor mechanism above the, Force connections with power take-off, From the beginning of the assembly the current, The provisional protections in the accesses to the gap, A closed room suitable for the deposit of, All the necessary work that specifically does not, Lighting of minimum lux landings., Installation of the telephone line up to the, observations, Various, Are considered in this contract as being on account of, Zardoya otis s.a., By padlock. Next to the lighting switch, The power switch shall be provided with an interlocking, According to the norm mibt, Up to the box according to scheme, If for a charge of kp each, Saria for the tools of work the tests, Ments of the elevator from its arrival work., Of the elevator., During the assembly period., For communication with the Otis plant., Install a plug, A maximum voltage drop of, Properly marked., A smooth gap with minor collisions of the, A watertight pit capable of withstanding loads, The necessary straps in the anchoring hole, The reception of the doors

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel, Wood
Measurement Units
Footprint Area
Building Features Elevator, Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

Leave a Reply

ADVERTISEMENT