Comprehensive flood defense plan for Puerto Reconquista with an area of approximately 360,000 m². This drawing illustrates a multi-component flood protection system along the San Jerónimo and San Javier rivers and Curupí and Del Rey creeks.

Key components include:
– Reinforced concrete containment walls at critical sections
– Cohesive soil embankments with slopes of 1:1.25
– Hydraulic fill embankments at specified locations
– Multiple discharge points with pump stations at progresives 380, 950, 1700, and 2160
– Access roads along National Route A009 with shoulder heightening

Technical Specifications:

– Project extends approximately 3,370 linear meters
– Cross-sectional profiles at 50m intervals showing embankment configurations
– Promenade width: 9.00m with protective barriers of 1.50m
– Typical embankment height: 6.40-7.10m above natural terrain
– Cross-section area: 15.70 m²

The plan integrates with existing infrastructure including the Municipal Nautical Club and Port Complex while accounting for natural waterway boundaries and terrain elevations.

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
Spanish
Materials
Concrete
Units
Metric
Area
Over 5000 m² (53819.5 ft²)
Features
Parking
Uploaded by
Engineer K
Category
Roads, Bridges and Dams
Published
May 14, 2025
Price $8.00
or

or get unlimited access from $7/mo

Browse All Downloads