Hotel Sanitary Plumbing And Storm Drainage Design, Buenos Aires DWG Plan for AutoCAD
Plans Plumbing, Sewer, Storm; Hotel in Capital Federal, Argentina. Work done for the University of UBA.Catedra Cereghetti Facilities 2
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
Facilities ii, Arq. Alejandro grupo, Terrace area inacc., Expansion sector, Confectionery sector, Expansion sector, Meeting sector, Health sector, Meeting sector, Reception sector, Kitchen sector, yard, fitness center, administration, Door step, Esc. Ci, Room maq., Lifts, Floor, ground floor, low level, Plant ss, Cpp, Cdv, Cpp, Cdv, Cpp, Cdv, Cpp, Cdv, Cpp, Cdv, Cpp, Cdv, Cpp, Cdv, Cpp, Cdv, Cpp, Cdv, pending, Distribution hall, A.c., Meter room, Of gas, Meter room, electricity, Transforming camera, Cll, Cpvc, Du., Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cpp, Cdv, Cpp, Cdv, Rooftop inaccessible, Pumping tank cap. Lts., Ehf, Ehf, Ehf, Ehf, Ehf, Ehf, Cpp, Cdv, Cll, Cpvc, Cpp, Cdv, Cpp, Cdv, Cll, Cpvc, Ehf, Ehf, Ehf, Ehf, Ehf, Ehf, Ehf, Ppa, Cpvc, Cpvc, discontinued, Cpvc, Cpvc, Imp., Cpp, Cpp, Ll.m., Ll.g, C.s., Imp., Cpvc, Imp., Bd, B.d.t, Bd, Bomb battery, Driving pipe, Cpp, discontinued, Cpp, discontinued, Cpvc, Bd, Cpp, Cdv, Cpp, Cdv, Suspended cpvc, Ehf, Ehf, Ehf, Ehf, Cpp, Daily total reserve calculation, level, rooftop, floor, low level, subsoil, Total adopted, Adopted pumping, Estimated consumption, Adopted reservation, Lts., total, Lts., Calculation of sections diameters, level, rooftop, floor, low level, subsoil, local, cabbage., Floor extension, column, theoretical, Adopt, Toilet, Full bathroom, rooftop, floor, low level, subsoil, C.s., Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, rooftop, floor, low level, subsoil, Toilet, Full bathroom, rooftop, floor, low level, subsoil, C.s., Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, C.s., Calculation of sections diameters, level, rooftop, floor, low level, subsoil, local, cabbage., Floor extension, column, theoretical, Adopt, Toilet, Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, rooftop, floor, low level, subsoil, Toilet, Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, rooftop, floor, low level, subsoil, Full bathroom, Termotanq., I calculate home connection, Piezometric level, N. Piezom. Effect., Rtd, Time filled, spending, Connection, Mc, Lts., Sg., Adop, Calculation, Pump flow, Vel. admissible, Theoretical diameter, Diameter adopted., M.a., I calculate drive equipment, Equivalent height, lost, Geometric height, Manometric height, Mts., flow, brand, model, power, Salmon, Muh, Mts., Mts., Calculation e.g. A.c.s., Flow control, Pipe adop., Gas consumption, brand, model, Calorific power, Rheem, com, Calculus b.r. For a.c.s., flow, Vel. Adm., Equivalent height, lost, brand, model, power, Grundfos, Mts., M.a., full, Cll, Cpvc, Cll, Cpvc, Sanitary reserve tank, chap. Lts., Cppaf by sub-floor, Cll, Cpvc, Cll, Cpvc, Cll, Cpvc, Cppac suspended on ceilings, Ppa pp, Lvo., Ppa pp, Cppac suspended on ceilings, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Lvo., Du., Cll, Cpvc, Cll, Cpvc, Pp drive pipe, full, Cll, Cpvc, Cll, Cpvc, Cpp, Cdv, Cll, Cpvc, Cll, Cpvc, In masonry box, With metal cap, In masonry box, With metal cap, Cpp, Cdv, Cll, Cpvc, Cll, Cpvc, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Lvo., Du., Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ppa pp, Ba pp, Suspended ac return pipes, Suspended pipes, Cpp, Cdv, Cpp, Cdv, Cpp, Cdv, Return ac suspended pipe, Lvo., Ppa pp, Ppa pp, Ll.p.d, C.s.d, Llpd, manifold, Return to ac, Ppa pp, Ppa pp, Ppa pp, Lvo., Ll.p.d, C.s.d, Llpd, C.s.d, Llpd, C.s.d, Llpd, Ppa pp, Lvo., Du., Cloacal pumping well, chap. Lts., Cloacal pumping well, chap. Lts., Rainwater pumping well, chap. Lts., Cpp, discontinued, Impeller pumps, Brand: salmson, Model: muh, flow:, Recirculating pump, Brand: grundfos, Model: up, flow:, Thermotanks battery, Brand: rheem, Model: with, capacity:, Level of sidewalk, N.p.t., Kitchen floor, Fryer gas, Simple toaster, Modular stove anafe, Convector oven, Maq cafe expres, Municipal line, water level, Ll.p., Access cover, Ll.p., V.l., E., Ll.p., V., Electric float, C.v bronze mesh, full, Cll, Cpvc, Cpp, Cdv, full, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Cpp, Cpp, Ppa, Ppa, Cpp, Ppa, Ppa, Ppa, C
Raw text data extracted from CAD file:
Language | Spanish |
Drawing Type | Plan |
Category | Mechanical, Electrical & Plumbing (MEP) |
Additional Screenshots | |
File Type | dwg |
Materials | Masonry |
Measurement Units | |
Footprint Area | |
Building Features | Deck / Patio, Car Parking Lot |
Tags | aires, argentina, autocad, buenos, capital, Design, drainage, DWG, einrichtungen, facilities, federal, gas, gesundheit, health, Hotel, l'approvisionnement en eau, la sant, le gaz, machine room, maquinas, maschinenrauminstallations, plan, plans, plumbing, provision, Sanitary, sewer, storm, university, wasser bestimmung, water, work |