Comprehensive site layout for ESAB’s electrode manufacturing facility (Site I) featuring multiple industrial furnaces arranged in production lines. This plan shows several tunnel furnaces (Fornos Túnel 3, 4, 5, and 6) and convection furnaces (Fornos Convecção 07-11) with associated cooling cabins and material handling systems. Key production equipment includes presses (Prensas 01-05), wire scrapers, and various conveyor systems. The facility incorporates electrical infrastructure with transformer stations, compressed air systems, and dedicated utility areas. Support spaces include storage areas, meeting rooms, and sanitary facilities. The drawing includes elevation references with ground level (0.000) and platform levels (+190mm, +480mm). Layout organized for efficient production flow with clear material pathways and equipment spacing for maintenance access. Scale 1:500, units in millimeters.