Low Voltage System floor Plan for XinYuRen Technology Park Phase 2

Comprehensive low voltage system layout plan for Building #3 of XinYuRen Technology Park Phase 2. The drawing details the positioning of various low voltage equipment points across office spaces, meeting rooms, and utility areas.

Key Components:
– Server room (10.6m²) with raised static-free flooring and weight-bearing support structure
– UPS power distribution system with battery backup (DC 750V/125A capacity)
– Network infrastructure points for workstations in open office areas
– Meeting room AV systems including 85″ TV installation points
– Integrated elevator control systems for passenger and accessible elevators

Technical Specifications:

– Scale: 1:200
– Project Number: SZ202205
– Drawing completed: October 2023
– Design includes noise isolation requirements for server room
– Power supply requirements include dedicated 4*25+1*6 cabling with 125A/3P front-end switch
– Support structure specifications: 6.3# standard channel steel, minimum height 20cm, recommended 30cm

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
Chinese
Materials
Steel
Units
Metric
Area
1000 – 2499 m² (10763.9 – 26899.0 ft²)
Features
A/C, Elevator
Uploaded by
Engineer K
Category
Mechanical, Electrical & Plumbing (MEP)
Published
Oct 24, 2025
Price $6.00
or

or get unlimited access from $7/mo

Browse All Downloads