Comprehensive low voltage system layout plan for Building #3 of XinYuRen Technology Park Phase 2. The drawing details the positioning of various low voltage equipment points across office spaces, meeting rooms, and utility areas.
Key Components:
– Server room (10.6m²) with raised static-free flooring and weight-bearing support structure
– UPS power distribution system with battery backup (DC 750V/125A capacity)
– Network infrastructure points for workstations in open office areas
– Meeting room AV systems including 85″ TV installation points
– Integrated elevator control systems for passenger and accessible elevators
Technical Specifications:
– Scale: 1:200
– Project Number: SZ202205
– Drawing completed: October 2023
– Design includes noise isolation requirements for server room
– Power supply requirements include dedicated 4*25+1*6 cabling with 125A/3P front-end switch
– Support structure specifications: 6.3# standard channel steel, minimum height 20cm, recommended 30cm