Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Masonry Dam And Headworks DWG Block for AutoCAD

Masonry dam and headworks

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

variable, elevation, area, accumulated volume, graphic of, area, capacity, localization map, general flat masonry dam of curtain pouring, community: new, responsable:, average expenditure on site work, diameter of the work of taking, storage volume, lifespan of the board, spillway width, load on the spout, free board, maximum avenue, years, unicode, revised:, authorized:, date:, scale:, do not. of plane:, the indicated ones, level of azolves, of project new, area of ​​the basin, annual mean runoff, maximum curtain height, curtain length, crown width, crown lift, n. to. m. and., n. to. m. from, lifting work, useful capacity, capacity of azolves, masonry volume, flooded area, curtain slope, Estimated quantities of new, curtain, description, unity, quantity, despalme, Excavation in type II material, cyclopean concrete template, joint masonry with mortar in proportion, flattened with mortar in proportion of cm of thickness., compacted fill, chute, hydraulic concrete f’c, steel f and nominal diameter., talud, general plant, scale, workpiece shaft, Print, localization map, average expenditure on site work, diameter of the work of taking, storage volume, lifespan of the board, spillway width, load on the spout, free board, maximum avenue, level of azolves, of project new, area of ​​the basin, annual mean runoff, maximum curtain height, curtain length, crown width, crown lift, n. to. m. and., n. to. m. from, lifting work, useful capacity, capacity of azolves, fill volume, flooded area, curtain slope, community: new, date:, scale:, not flat:, the indicated ones, n.a.m.o, yam, elev., station, natural terrain, Jacketed, with concrete, cm., entry structure, natural terrain, cross section by the axis of the work of taking, curtain shaft, elev., exit structure, scale, elev., crown, entry structure, exit structure, excavation for channel, call inbox., n. of azolves, elev., station, plant detail in the outline of the work of making, scale, diam, cut, welding, max, reinforcement details, if in the same section more than one third of the tralape lengths are joined, they will be increased, in no case will be allowed to join in the same section of the rods., no overlap in rods of the no. higher. in these the rods will be welded according to the detail using electrodes, cut, detail, in both ways, cms c. to. c., vars. of the no., cut, before pouring, the tube with asphalt felt., entry, grid, plant, entry structure, exit structure, steel tip, mm mm, with flanges., concrete jacketed, cm, of thickness., floor grid in, valve box, concrete jacketed, cm, of thickness., given concrete, simple, entry grid, cm c. to. c., cm c. to. c., detail, detail, scale, scale, weldable flange, elev., vars. of the no., cm c. to. c., in both ways, cm c. to. c., vars. of the no., entry, grid, in both ways, cms c. to. c., vars. of the no., scale, floor grate, scale, In addition to those indicated in other stations in kilometers elevation in meters above sea level, concrete will be used in the jacket of the pipeline. Before dismantling the structures of the intake work, a poor concrete slab of cm thick should be cast. for the construction of the entrance box, concrete with a strength of f’c should be used, the reinforcement steel will be of high degree with diameters overlaps. must not overlap or weld more than the reinforcement in the same section. the armed persons indicated in each of the details must be respected. Special care will be taken in cleaning the reinforcing steel to prevent it from having loose rust before depositing the concrete. the depth of the dentellons of the entry box may vary the judgment of the resident engineer. the structure of the intake work must be displaced on natural ground. for the manufacture of the grids, structural steel with resistance must be used to join the elements of the submerged arc welding with similar electrodes. The metallic structure will take a coat of anticorrosive paint when leaving the workshop. the pipe will be of steel to the schedule without of mm the special pieces will be of fo.fo. It is important to perform the hydrostatic test of the piping parts before putting into operation the intake work. The estimated quantities indicated correspond only to the structure of the intake work. any variation remains the judgment of the resident engineer., estimated new, description, unity, quantity, reinforcement steel fy, steel tube to ID without mm, gate valve of fo.fo. with screw flanges

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Block
Category
Additional Screenshots
File Type dwg
Materials Concrete, Masonry, Steel, Other
Measurement Units
Footprint Area
Building Features
Tags , , , , , ,

ADVERTISEMENT

Plans_Designs

Leave a Reply

ADVERTISEMENT