MEP building section and sanitary drainage layout for a multi-level medical facility. Covers basement through roof levels incl. specialized histotechnology labs, residents’ quarters, and staff areas. Includes technical details for PVC piping (2″, 4″, 6″ dia.), typical connection configurations for yees/tees, and trench bedding specifications for soil and vehicular traffic areas.