Park Lighting and Substation Detail Plan for april 2 Park Project

Detailed illumination and electrical substation design for the April 2 Park (Công Viên 2 Tháng 4) in Don Duong District, Vietnam. This drawing features precise positioning of outdoor lighting fixtures, electrical conduits, transformer substation locations, and drainage systems.

Key Technical Components:

  • Outdoor pathway lighting with 127W luminaires
  • Electrical distribution system with underground conduits
  • Transformer substation integration with landscaping elements
  • Surface water drainage utilizing 2×4 stone channels and spiral plastic piping

The design incorporates various vegetation elements including Locust trees (Lộc Vừng) and Bông Giấy among other plant species strategically positioned around the lighting infrastructure. Drainage solutions utilize M150 grade concrete (1:2 aggregate ratio) for pathways and service areas surrounding the electrical infrastructure. Vietnamese design standards for public park illumination are followed with particular attention to safety clearances around electrical equipment.

FREE

File Details

File Type
DWG
Type
Detail
Language
Arabic
Materials
Concrete, Plastic, Steel
Units
Metric
Area
1000 – 2499 m² (10763.9 – 26899.0 ft²)
Features
Garden / Park
Uploaded by
Engineer K
Downloads
1 downloads
Category
Parks & Landscaping
Published
May 22, 2025

Download faster, ad-free, with more daily files from $7/mo

Browse All Downloads