Detailed illumination and electrical substation design for the April 2 Park (Công Viên 2 Tháng 4) in Don Duong District, Vietnam. This drawing features precise positioning of outdoor lighting fixtures, electrical conduits, transformer substation locations, and drainage systems.
Key Technical Components:
- Outdoor pathway lighting with 127W luminaires
- Electrical distribution system with underground conduits
- Transformer substation integration with landscaping elements
- Surface water drainage utilizing 2×4 stone channels and spiral plastic piping
The design incorporates various vegetation elements including Locust trees (Lộc Vừng) and Bông Giấy among other plant species strategically positioned around the lighting infrastructure. Drainage solutions utilize M150 grade concrete (1:2 aggregate ratio) for pathways and service areas surrounding the electrical infrastructure. Vietnamese design standards for public park illumination are followed with particular attention to safety clearances around electrical equipment.