Ardvarc Control Enclosure Haztech Connections for Autonomous Drilling

Wiring details for the Ardvarc control enclosure (ACE) specifically handling Haztech connections. This layout covers the DE and NDE hoods for both CS and NCS sides. Includes pinouts for LiDAR 3D sensors, fisheye cameras, and IR illuminators. Shows M12 plug configurations (4-pin, 5-pin) and onsite RJ45 wiring instructions.Contains info on braided looms & twisted pairs wiring.

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
English
Materials
N/A
Units
Metric
Uploaded by
Blueprint Hub
Category
Mechanical, Electrical & Plumbing (MEP)
Published
May 20, 2026
Price $8.33
or

or get unlimited access from $7/mo

Browse All Downloads