It is a complete bridge project where this superstructure and footage
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
scale: indicated, description, revisions, date, approved :, azangaro section – inambari bridge, designed :, drew :, verified: left abutment excavation, carla bridge, elet datum, definitive study of the southern interoceanic road corridor azangaro section – inambari bridge , right abutment excavation, provisional deviation, date:, to san gaban, a pte inambari, concrete screed, natural terrain, channel diversion, left abutment filling, right abutment filling, plant and longitudinal profile