Highway Plan and Profile Drawing for 36.4km Alignment NH 167BG

Comprehensive highway engineering drawing showing both plan and profile views of a major roadway project spanning 36.4km. The drawing contains detailed vertical alignment reports for sections KM 14+000 to 22+000 and KM 25+000 to 34+000, plus horizontal alignment data covering the entire corridor (KM 0+000 to 36+400).

The profile sections feature elevation datums ranging from 138m to 198m, with each kilometer segment clearly demarcated. Key infrastructure elements include:

Design Components:
– Road centerlines with geometric data
– Drainage facilities including ditches and culverts
– Box culvert structures
– Earthworks (cut/fill areas)
– Right-of-way boundaries
– Paved shoulders and footpaths

The drawing integrates multiple cross-referenced elements (XREFs) for base topography, proposed improvements, and technical cross-sections. Layer organization indicates compliance with standard highway engineering practices, with separate categories for structural elements, drainage, geometric controls, and earthworks.

PREMIUM

File Details

File Type
DWG
Type
Plan
Language
English
Materials
Concrete
Units
Metric
Area
Over 5000 m² (53819.5 ft²)
Uploaded by
Engineer K
Category
Roads, Bridges and Dams
Published
Jun 10, 2025
Price $7.50
or

or get unlimited access from $7/mo

Browse All Downloads