Los Pelambres Choapa 3 Pipeline Alignment

Water pipeline route for the Los Pelambres project, about 7.4km long. covers the stretch from Choapa Station 3 to the North-South pools, incl. topo, industrial roads, and all those inspection chambers with venting/drain valves. I’ve included the longitudinal profile too. Trazado de tubería de agua de 7,4 km para el proyecto Los Pelambres, desde la Estación Choapa 3 hasta las Piscinas Norte-Sur. Incluye topografía, caminos industriales y cámaras de inspección.

PREMIUM

File Details

File Type
DWG
Type
Full Project
Language
Spanish
Materials
Steel, Concrete
Units
Metric
Area
Over 5000 m² (53819.5 ft²)
Uploaded by
Mira Blocks
Category
Public Facilities, Water Sewage & Electricity Infrastructure
Published
Jun 18, 2026
Price $8.06
or

or get unlimited access from $7/mo

Browse All Downloads