Help on GoFundMe

ADVERTISEMENT

ADVERTISEMENT

Media Registration For Tension In Bench DWG Detail for AutoCAD

CONSTRUCTION DETAIL RECORD FOR MEDIA TENSION IN BENCH TYPE 3; NORMA CFE – RMTB3. DISTRIBUTION – UNDERGROUND CONSTRUCTION SYSTEMS (PLANT; CORTES E ISOMETRIC; MEASURES AND SPECIFICATIONS)

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Of underground systems, On bench type, Recording for medium voltage, rule, Construction specifications dimensions in centimeters. The reinforcing steel will be welded mesh f and kpa all concrete f’c kpa t.m.a. All the concrete will be elaborated with integral waterproofing in accordance with the recommendations of the product. All the concrete will vibrate to achieve adequate compaction. The coatings will be minimal. The concrete will have finished apparent in the common interior in the exterior not allowing the use of natural slopes of terrain like outside cimbra only will be allowed in land with material type iii previous wetting. All edges will be chamfered mm. Cast concrete template poor f’c cm. Of thickness in case of being cast in place. The fillers will adhere to the present specification with degree of compaction of the proctor for bench for all the layers not greater of cm of thickness for stream will be of compaction only the last two layers will be of cm of thickness the inferior layers will be cm of thickness of Compaction proctor. The copper wire of the ground system must be cross-sectional of all interconnections of the ground systems should be by self-welding type. For water levels, the ground rods should be left outside by inserting the copper cable through the polyduct sleeve sealing the carcamo. When the water level is low, the ground rod is installed in the carcass, and no pipeline is left in the wall of the log. The quality of the materials will be checked by an authorized laboratory, and the assembly will be carried out on site. The records must be identified by the abbreviations type of date of month first year two number serial number of the marks must be under relief on any of the interior faces of the register without interfering with the perforation of the ducts with letters of cm of minimum height. For marine environment salty soils should be used cement type according to the norm nom in case the records are must be inspected by the lapem during its construction to have its corresponding proof notice. In all the terminals of the ducts must be eliminated the sharp edges by means of the one in the case that the register is the diameter of the number of holes should be in function of the needs of the project respecting the type of steel reinforcement of walls thickness of The requested concrete strength. For prefabricated logs the carcass instead of coming from a factory it is possible that at the site intended to be left the hole with joints glued to be cured in with a mixture of the concrete of the requested strength joints additives wetting the edge where they are Locate the gasket before casting in place. Use of registry: as registration until ductos in as of passage. As registration until ductos in a., Detail, ground floor, Carcamo, note, Armed e.m. F’y kpa, Plant cover, Cap ring, Armed e.m. F’y kpa, cut, Holes for ducts cm. When the project marks more entries for pipeline, they should be considered in the, Isometric, Cable support sliders, Location of sliders for cable support, cut, Rod of reinforcement of the brocal f’y kpa, Detail, ground floor, Ducts, Armed e.m. F’y kpa, Ducts, Mm, cut, Armed e.m. F’y kpa

Raw text data extracted from CAD file:

Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):

Of underground systems, On bench type, Recording for medium voltage, rule, Construction specifications dimensions in centimeters. The reinforcing steel will be welded mesh f and kpa all concrete f’c kpa t.m.a. All the concrete will be elaborated with integral waterproofing device according to the recommendations of the product. All the concrete will vibrate to achieve proper compaction. The coatings will be minimal. The concrete will have finished apparent in the common interior in the exterior not allowing the use of natural slopes of terrain like exterior cimbra only will be allowed in ground with material type iii previous wetting. All edges will be chamfered mm. Cast concrete template poor f’c cm. Of thickness in case of being cast in place. The fillers will adhere to the present specification with degree of compaction of the proctor for curb for all the layers not greater of cm of thickness for stream will be of compaction only the last two layers will be of cm of thickness the inferior layers will be of cm of thickness of Compaction proctor. The copper wire of the ground system must be cross-sectional of all interconnections of the ground systems should be by self-welding type. For water levels, the ground rods should be left outside by inserting the copper cable through the polyduct sleeve sealing the carcamo. When the water level is low, the ground rod is installed in the carcass, and no pipeline is left on the wall of the log. The quality of the materials will be checked by an authorized laboratory, and the assembly will be carried out on site. The records must be identified with the abbreviations type of date of month first year two number serial number of the marks must be under relief on any of the interior faces of the register without interfering with the perforation of the ducts with letters of cm of minimum height. For marine environment salty soils must be used cement type according to the standard nom in case the records are must be inspected by the lapem during its construction to have its corresponding proof notice. In all the terminals of the ducts must be eliminated the sharp edges by means of the one in the case that the register is the diameter of the number of holes should be in function of the needs of the project respecting the type of steel reinforcement of walls thickness of The requested concrete strength. For prefabricated logs the carcamo instead of coming from factory built it is possible that at the site intended to be left the hole with sealing joints to be cured in with a mixture of the concrete of the requested strength joints additives wetting the edge where they are Locate the gasket before casting in place. Use of registry: as registration until ductos in as of passage. As registration until ductos in a., Detail, ground floor, Carcamo, note, Armed e.m. F’y kpa, Plant cover, Cap ring, Armed e.m. F’y kpa, cut, Holes for ducts cm. When the project marks more entries for pipeline, they should be considered in the, Isometric, Cable support sliders, Location of sliders for cable support, cut, Rod of reinforcement of the brocal f’y kpa, Detail, ground floor, Of pipelines, Armed e.m. F’y kpa, Of pipelines, Mm, cut, Armed e.m. F’y kpa

Raw text data extracted from CAD file:

Language Spanish
Drawing Type Detail
Category
Additional Screenshots
File Type dwg
Materials Concrete, Steel, Other
Measurement Units
Footprint Area
Building Features Car Parking Lot
Tags , , , , , , , , , , , , , , , , , , , , , , , , , , , ,

ADVERTISEMENT

CAD Drawings

Leave a Reply