Scheme with instructions for repair of pipeline execution whitewater park
Drawing labels, details, and other text information extracted from the CAD file (Translated from Spanish):
gate valve, Compaction construction of asphalt, Excavation of hole sealing trench in compressed steel pipe compacted with excavation material of construction of cm of construction of base of cm of thickness, Gate valve that controls the water supply to the mall, Traffic painting for demarcation of continuous line passage for lateral demarcation of discontinuous line road for central demarcation of roadway, Demolition rebuilding of brocals of each strip of concrete pavement of m. Traffic paint for rebuilt broads, Patio view iii